5. <strong>APR</strong>CL - VNR (JV)<br />
Our Company has entered into an Memorandum of Understanding/ Joint Venture Agreements with M/s VNR<br />
Infrastructures <strong>Limited</strong> (formerly M/s V Narayana Reddy) (collectively referred to as “Partners”) pursuant to<br />
which joint venture entity <strong>APR</strong>CL-VNR (JV) has been formed for bidding and execution of following projects:<br />
(a) Memorandum of Understanding dated November 11, 2006 for jointly bidding for the bids called for by Rail<br />
Vikas Nigam <strong>Limited</strong> for carrying out “Construction of new B.G. line from Obulavaripalle to Krishnapatnam<br />
– Phase 1 works from Venkatachalam to Krishnapatnam in South Central Railway which includes Earth<br />
Work in formation, Construction of bridges, Services and Residential Buildings, Installation of Tracks,<br />
Station yards, General Electrical works including Power Line Crossing and other Miscellaneous works along<br />
with testing and Commissioning including Supply of all materials, Except Rails, Line Sleepers and<br />
Turnouts”. The share between the partners for said work is in the ratio of 85:15, <strong>APR</strong>CL: VNR.Rail Vikas<br />
Nigam <strong>Limited</strong> has awarded the contract to the JV vide letter dated March 29, 2007. The said Joint Venture<br />
has entered in to a sub-contracting agreement dated June 23, 2007 with <strong>APR</strong>CL whereby the entire project<br />
was sub-contracted to our Company for a commission of 0.75% on gross bills.<br />
(b) Memorandum of Understanding dated October 18, 2007 for jointly bidding for the bids called by Steel<br />
Authority of India <strong>Limited</strong> for carrying out “Development/ Construction of Railway Yard facilities under<br />
expansion plan of SAIL-ISP near Damodar Railway Station.” The share between the partners for said work<br />
is in the ratio of 70:30, <strong>APR</strong>CL: VNR. Steel Authority of India <strong>Limited</strong> has awarded the contract to the JV<br />
vide letter dated March 13, 2008. The said Joint Venture has entered in to a sub-contracting agreement dated<br />
January 27, 2009 with our Company, whereby the entire project was sub-contracted to our Company for a<br />
commission of 0.50% on gross bills.<br />
(c) Memorandum of Understanding dated September 13, 2008 for jointly bidding for the bids called by<br />
Northeast Frontier Railway for the carrying out “Civil Engineering works from Km 0 – 42 (between Siliguri<br />
Junction to Galgalia (excluding) in connection with SGUJ – AUB Gauge Conversion Project under Deputy<br />
Chief Engineer, Construction,N.F. Railway, New Jalpaiguri. The work includes feasibility study of Major &<br />
Minor Bridges : Earthwork in embankment & cutting, blanketing, construction of Minor Bridges;<br />
construction of Major Bridges (Substructure & superstructure); construction / making of RBG Rooms,<br />
Platforms, PP sheds, FOB‟s, Level Crossings and other ancillary works.” The share between the partners for<br />
said work is in the ratio of 55:45, <strong>APR</strong>CL: VNR.Northeast Frontier Railway has awarded the contract to the<br />
JV vide letter dated December 26, 2008. The said Joint Venture has entered in to sub-contracting agreements<br />
dated March 11, 2009 with our Company, whereby the entire project has been sub-contracted to our<br />
Company for a commission of 0.25% on gross bills.<br />
(d) Memorandum of Understanding dated September 13, 2008 for jointly bidding for the bids called by<br />
Northeast Frontier Railway for the carrying out “Civil Engineering works from Km 42 – 76.2 (between<br />
Adhikari (excluding) to Aluabari Road) in connection with SGUJ – AUB Gauge Conversion Project under<br />
Deputy Chief Engineer, Construction, N.F. Railway, New Jalpaiguri. The work includes feasibility study of<br />
Major & Minor Bridges : Earthwork in embankment & cutting, blanketing, construction of Minor Bridges;<br />
construction of Major Bridges (Substructure & superstructure); construction / making of RBG Rooms,<br />
Platforms, PP sheds, FOB‟s, Level Crossings and other ancillary works.” The share between the partners for<br />
said work is in the ratio of 55:45, <strong>APR</strong>CL: VNR. Northeast Frontier Railway has awarded the contract to the<br />
JV vide letter dated December 26, 2008. The said joint venture has entered in to sub-contracting agreements<br />
dated March 11, 2009 with our Company, whereby the entire project has been sub-contracted to our<br />
Company for a commission of 0.25% on gross bills.<br />
(e) Joint Venture/ConsortiumAgreement dated October 12, 2009 jointly bidding for the bids called by Northeast<br />
Frontier Railway for “Construction and Foundation & substructure of 3 X 61.10m span Major Br. No. 94 on<br />
river Gomti at KM 39/180 on well foundation with earthwork at bridge approaches, other<br />
protection/ancillary works as per railway approved drawing and specification in Agartala and Udaipur<br />
section in connection with Agartala – Subroom new Railway line Project”. The share of profits between the<br />
partners for said work is in the ratio of 55:45, VNR: <strong>APR</strong>CL. <strong>APR</strong>CL: VNR. Northeast Frontier Railway has<br />