DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. The Drawings and Project Manual cover new construction for the Rosemary Beach Owners<br />

Center, Rosemary Beach, Florida.<br />

1.2 PROCUREMENT OF BIDDING DOCUMENTS<br />

A. Invited General Contractors will be provided electronic files in <strong>pdf</strong> format. These files will be<br />

emailed by way of a download service.<br />

1.3 EXAMINATION OF BIDDING DOCUMENTS AND SITE<br />

A. Prior to submitting a Bid, each bidder shall carefully examine the Bidding Documents. Each<br />

bidder shall fully inform him/herself prior to bidding as to all limitations under which the work is<br />

to be performed and shall include in his/her bid a sum to cover the costs of all items necessary<br />

to perform that work as set forth in the Contract Documents.<br />

B. Bidders are encouraged to visit the construction site at Rosemary Beach, Florida.<br />

C. No allowance will be made to any Bidder because of lack of such examination or knowledge.<br />

The submission of a Bid will be construed as conclusive evidence that the Bidder has made such<br />

an examination.<br />

1.4 INTERPRETATIONS AND ADDENDA<br />

A. The Bidder shall carefully examine and compare the Bidding Documents, site and local<br />

conditions with each other and no later than ten (10) days prior to the date for receipt of Bids,<br />

make a written request to the Architect for interpretation or correction of any errors,<br />

ambiguities or inconsistencies found during his examination.<br />

B. Interpretations, corrections and change to the Bidding Documents will be made by Addendum.<br />

Addendums will be mailed, faxed or emailed to each Bidder of record. The Architect and the<br />

Owner will not be responsible for interpretations, corrections or changes made in any other<br />

manner, and the Bidder shall not rely on them<br />

C. Any item, material, condition, service, etc. that may be alluded to in the drawings or<br />

specifications, and that is not clearly understood by the bidder as to the Architects intent, shall<br />

be clarified by the bidder prior to the Bid. Failure to clarify any ambiguity shall not relieve the<br />

bidder from supplying the intent of the Architect as part of the base contract.<br />

1.5 SUBSTITUTIONS (Prior to bidding)<br />

A. Substitutions will be considered prior to receipt of Bids only if a written request for approval is<br />

submitted to the Architect no later than ten (10) days prior to the date for receipt of Bids. Each<br />

request shall include a complete description of the proposed substitution, along with drawings,<br />

performance and test data, any other information required for a complete evaluation. The<br />

Architect’s decision of approval or disapproval will be final. If the Architect approves the<br />

proposed substitution, such approval will be set forth in addenda. Bidders shall not rely on<br />

approvals made in any other manner.<br />

B. Substitutions will be considered after the Contract award only if they are in compliance with the<br />

conditions set in Division 1 Section “Product Requirements.”<br />

C. Substitution Request Form: Use CSI Form 13.1A.<br />

INSTRUCTIONS TO BIDDERS 00 21 13 -1