30.01.2015 Views

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DAG Architects Inc.<br />

12042 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Galvanized-Steel Sheet: ASTM A 653/A 653M, G90 (Z275) zinc coating, mill phosphatized.<br />

B. Fasteners: Use types and sizes to suit unit installation conditions.<br />

1. For fastening galvanized steel, use 300 series stainless-steel fasteners.<br />

2. For color-finished louvers, use fasteners with heads that match color of louvers.<br />

C. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.<br />

2.2 FABRICATION, GENERAL<br />

A. Fabricate frames, including integral sills, to fit in openings of sizes indicated, with allowances<br />

made for fabrication and installation tolerances, adjoining material tolerances, and perimeter<br />

sealant joints.<br />

B. Join frame members to each other and to fixed louver blades with fillet welds concealed from<br />

view unless otherwise indicated or size of louver assembly makes bolted connections between<br />

frame members necessary.<br />

2.3 FIXED LOUVERS<br />

A. Storm-Resistant Louver:<br />

1. Manufacturer’s: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

a. Arrow United Industries; a division of Mestek Inc.<br />

b. Construction Specialists, Inc.<br />

c. Ruskin Company; Tompkins PLC.<br />

2. Louver Depth: 5 inches (125 mm).<br />

3. Frame and Blade Nominal Thickness: Not less than 0.080 inch (2.52 mm) for blades and<br />

0.080 inch (2.03 mm) for frames.<br />

4. Louver Performance Ratings: Maximum standard airflow not less than 8500 cfm with not<br />

more than 0/20-inch static pressure loss.<br />

2.4 LOUVER SCREENS<br />

A. General: Provide screen at each exterior louver.<br />

B. Louver Screen Frames: Same kind and form of metal as indicated for louver to which screens<br />

are attached.<br />

C. Louver Screening:<br />

1. Bird Screening: Galvanized steel, 1/2-inch- (13-mm-) square mesh, 0.041-inch (1.04-<br />

mm) wire.<br />

2.5 GALVANIZED-STEEL SHEET FINISHES<br />

A. Surface Preparation: Clean surfaces with nonpetroleum solvent so surfaces are free of oil and<br />

other contaminants. After cleaning, apply a conversion coating suited to the organic coating to<br />

be applied over it. Clean welds, mechanical connections, and abraded areas and repair<br />

according to ASTM A 780.<br />

B. Baked-Enamel or Powder-Coat Finish: Immediately after cleaning and pretreating, apply<br />

manufacturer's standard 2-coat, baked-on finish consisting of prime coat and thermosetting<br />

topcoat, with a minimum dry film thickness of 1 mil (0.025 mm) for topcoat. Comply with coating<br />

manufacturer's written instructions for applying and baking to achieve a minimum dry film<br />

thickness of 2 mils (0.05 mm) .<br />

1. Color and Gloss: As selected by Architect from manufacturer's full range.<br />

LOUVERS AND VENTS 08 90 00 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!