DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

a. Submittals Schedule: Submittals shall be submitted within thirty (30) days<br />

after the contract is awarded. It is not the responsibility of the Engineer to<br />

expedite the review of submittals if the contractor has not adequately<br />

prepared the submittals in a time efficient manner. The contractor bears all<br />

the responsibility for the added time requirements of resubmittals.<br />

b. Identification: Place a permanent label or title block on each submittal for<br />

identification. Each major section of submittals such as power equipment,<br />

lighting equipment, fire alarm, etc., shall be secured in a booklet or stapled<br />

with a covering index which lists the following information:<br />

1) Project name and date<br />

2) Name, address, and phone number of General contractor and project<br />

manager.<br />

3) Name, address, and phone number of Sub-contractor and project<br />

manager.<br />

4) Supplier of equipment with phone number and person responsible for<br />

this project.<br />

5) Index of each item covered in submittal and model number.<br />

6) Any deviation from contract documents shall be specifically noted on<br />

submittal cover index and specifically identified with highlighting,<br />

encircling, or boldly on specific submittal sheet.<br />

c. Resubmittals: Make resubmittals in same form and number of copies as<br />

initial submittal.<br />

1) Include previous submittal review comments.<br />

2) For each item being resubmitted, include previous review comment<br />

and explain how resubmitted item meets the criteria of the previous<br />

review comment.<br />

2. Electrical and Mechanical/Plumbing/Fire Protection Equipment Coordinations:<br />

The electrical power equipment submittals shall be accompanied by a<br />

letter verifying coordination of electrical services for all mechanical,<br />

plumbing, and fire protection equipment requiring power. The letter shall<br />

follow the format listed below.<br />

To: ________________________________<br />

(General Contractor)<br />

Re: ________________________________<br />

(Project name and location)<br />

We the undersigned subcontractors certify that we have coordinated the<br />

electrical requirements for mechanical, plumbing, and fire protection<br />

sprinkler equipment as evidenced by the coordination chart listed herein.<br />