30.01.2015 Views

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.4.1 In addition to the data required for any specified performance tests, measure and record the<br />

temperatures, pressures, flow rates, and nameplate data for all components listed herein.<br />

3.4.2 It is the intent of this section to record data on balanced systems, under normal operating or<br />

design conditions.<br />

3.4.3 Temperatures:<br />

3.4.4 Pressures:<br />

1. Outside dry and wet bulb temperatures.<br />

2. Dry bulb temperature in each room and at least one wet bulb temperature in each zone.<br />

3. Refrigerant liquid and suction temperatures.<br />

4. Inlet and outlet temperature of each heat exchange device - both fluids.<br />

1. Suction and discharge static pressure of each fan.<br />

2. Suction and discharge pressure of each pump.<br />

3. Each refrigerant suction and discharge pressure.<br />

3.4.5 Flow rates:<br />

1. Flow rate through each fan.<br />

3.4.6 Nameplate Data:<br />

1. Complete nameplate data for all equipment.<br />

2. Motor data to include horsepower, phase, voltage, RPM, full load nameplate current, fuse<br />

rating in disconnect switch, number or manufacturer's size designation, and ampere<br />

rating of overcurrent and low voltage protection devices in starters.<br />

3.5 All test openings in ductwork shall be resealed in an approved manner.<br />

END OF SECTION 23 05 93<br />

TESTING AND BALANCING OF MECHANICAL SYSTEMS 23 05 93 - 4/4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!