DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach, Fl.<br />

Item<br />

Load<br />

Full Load<br />

Amps<br />

1 Phase<br />

or<br />

3 Phase<br />

Number of<br />

Electrical<br />

Connections<br />

Maximum<br />

Overcurrent<br />

Protection<br />

Minimum<br />

Overcurrent<br />

Protection<br />

Breaker<br />

Proposed<br />

Circuit<br />

Proposed<br />

The above list details all required electrical connections for mechanical<br />

equipment.<br />

Signed: _______________________<br />

For: __________________________<br />

Mechanical Subcontractor<br />

The above list details all required electrical connections for plumbing<br />

equipment.<br />

Signed: _______________________<br />

For: __________________________<br />

Plumbing Subcontractor<br />

The above list details all required electrical and fire alarm connections for<br />

fire protection equipment.<br />

Signed: _______________________<br />

For: __________________________<br />

Fire Protection Sprinkler Subcontractor<br />

The above list of equipment has been reviewed and the required<br />

connections are being provided. (Any exceptions or request for direction<br />

shall be listed here)<br />

Signed: ________________________<br />

For: ___________________________<br />

Electrical Subcontractor<br />

1.7 PRODUCT DELIVERY, STORAGE AND HANDLING<br />

A. PROTECTION: Take necessary precautions to protect all material, equipment,<br />

apparatus and work from damage. Failure to do so to the satisfaction of the Architect<br />

will be sufficient cause for the rejection of the material, equipment or work in question.<br />

Contractor is responsible for the safety and good condition of the materials installed until<br />

final acceptance by the owner.<br />

ELECTRICAL GENERAL REQUIREMENTS 26 05 00 - 5/8