30.01.2015 Views

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DAG Architects Inc.<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

B.<br />

Alternate No. 2: Dog Park<br />

Provide a deductive price for the Dog Park to include the following items:<br />

1. 4’ high concrete garden wall and gates.<br />

2. Metal fencing<br />

3. Aggregate walkway and metal edging<br />

4. All Lawn and Landscaping<br />

5. This area shall remain in its existing vegetative state.<br />

C. Alternate No. 3: Green Wall as shown and detailed on Landscape Drawings<br />

D. Alternate No. 4:<br />

Schedules<br />

Sliding Doors/Louvers as identified on Architectural Floor Plans and<br />

END OF SECTION 01 23 0<br />

Provide a deductive price for the 2 Bocce Ball Courts to include the following items:<br />

1. Aggregate walkway and metal edging to the gate at the Dog Park.<br />

2. Concrete Walkway and benches all around the 2 Bocce Ball Courts.<br />

3. 6’ high concrete privacy wall on the east side of the Bocce Ball Courts.<br />

4. Stadium Style seating, steps and raised planters.<br />

5. All Landscaping shall remain, grassed lawn areas shall be added in place of all removed<br />

hardscape, courts, and seating areas.<br />

ALTERNATES 01 23 00 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!