DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

Remove and replace construction that has been cut and patched in a visually<br />

unsatisfactory manner.<br />

1.3 WARRANTY<br />

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or<br />

damaged during installation or cutting and patching operations, by methods and with materials<br />

so as not to void existing warranties.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. General: Comply with requirements specified in other Sections.<br />

1. For projects requiring compliance with sustainable design and construction practices and<br />

procedures, utilize products for patching that comply with requirements of Division 01<br />

Section "Sustainable Design Requirements."<br />

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed<br />

surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent<br />

possible.<br />

1. If identical materials are unavailable or cannot be used, use materials that, when<br />

installed, will provide a match acceptable to the Architect for the visual and functional<br />

performance of in-place materials.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Existing Conditions: The existence and location of underground and other utilities and<br />

construction indicated as existing are not guaranteed. Before beginning sitework, investigate<br />

and verify the existence and location of underground utilities, mechanical and electrical<br />

systems, and other construction affecting the Work.<br />

1. Before construction, verify the location and invert elevation at points of connection of<br />

sanitary sewer, storm sewer, and water-service piping; underground electrical services,<br />

and other utilities.<br />

2. Furnish location data for work related to Project that must be performed by public utilities<br />

serving Project site.<br />

B. Examination and Acceptance of Conditions: Before proceeding with each component of the<br />

Work, examine substrates, areas, and conditions, with Installer or Applicator present where<br />

indicated, for compliance with requirements for installation tolerances and other conditions<br />

affecting performance. Record observations.<br />

1. Verify compatibility with and suitability of substrates, including compatibility with existing<br />

finishes or primers.<br />

EXECUTION 01 73 00 - 2/8