DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

3.3.3 Paint all black steel hangers with black enamel. Galvanized steel and copper clad hangers do<br />

not require paint.<br />

3.3.4 Prevent electrolysis in support of copper tubing by use of hangers and supports which are<br />

copper plated, or by other recognized industry methods.<br />

3.3.5 Provision for Movement:<br />

3.3.5.1 Install hangers and supports to allow controlled movement of piping systems and to permit<br />

freedom of movement between pipe anchors, and to facilitate action of expansion joints,<br />

expansion loops, expansion bends and similar units.<br />

3.3.5.2 Load Distribution: Install hangers and supports so that piping live and dead loading and<br />

stresses from movement will not be transmitted to connected equipment.<br />

3.3.5.3 Pipe Slopes: Install hangers and supports to provide indicated pipe slopes, and so that<br />

maximum pipe deflections allowed by ANSI B31 are not exceeded.<br />

3.3.6 Insulated Piping: Comply with the following installation requirements.<br />

3.3.6.1 Shields: Where low-compressive-strength insulation or vapor barriers are indicated, install<br />

coated protective shields.<br />

3.3.6.2 Clamps: Attach clamps, including spacers (if any), to piping with clamps projecting through<br />

insulation; do not exceed pipe stresses allowed by ANSI B31.<br />

3.4 Installation of Anchors:<br />

3.4.1 Install anchors at proper locations to prevent stresses from exceeding those permitted by ANSI<br />

B31, and to prevent transfer of loading and stresses to connected equipment.<br />

3.4.2 Fabricate and install anchors by welding steel shapes, plates and bars to piping and to<br />

structure. Comply with ANSI B31 and with AWS standards.<br />

3.4.3 Anchor Spacings: Where not otherwise indicated, install anchors at ends of principal piperuns,<br />

at intermediate points in pipe-runs between expansion loops and elbows. Make<br />

provisions for preset of anchors as required to accommodate both expansion and contraction<br />

of piping.<br />

3.4.4 Where expansion compensators are indicated, install anchors in accordance with expansion<br />

unit manufacturer's written instructions to limit movement of piping and forces to maximums<br />

recommended by manufacturer for each unit.<br />

END OF SECTION 22 05 48<br />