nonpermanent labels, and clean surfaces. Protect glass from contact with contaminating<br />

substances resulting from construction operations, including weld splatter. If, despite such<br />

protection, contaminating substances do come into contact with glass, remove substances<br />

immediately as recommended by glass manufacturer.<br />

B. Remove and replace glass that is broken, chipped, cracked, or abraded or that is damaged from<br />

natural causes, accidents, and vandalism, during construction period.<br />

3.3 GLASS SCHEDULE<br />

A. Type “A”: All exterior glazing shall be impact rated laminated glazing as required per The Florida<br />

Building Code.<br />

Nominal Thickness: 9/16-inch thick float glass.<br />

B. Type “B”: All interior non-fire rated locations.<br />

Nominal Thickness: 1/4 inch thick clear fully tempered float glass.<br />

C. Type “D” Provide at interior 20 to 90 minute fire-rated openings.<br />

Nominal 3/16-inch thick glazing, impact safety rated, which meets ANSI Z97.1 and CPSC 16 CFR<br />

1201 (Category I and II) clear glass.<br />

See Paragraph 2.2, Fire-Rated Glazing Products.<br />

END OF SECTION 08 80 00<br />

GLAZING 08 80 00 - 7