30.01.2015 Views

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

2013 4 29 ROSEMARY BEACH PROJECT MANUAL.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DAG Architects Inc.<br />

12041 Rosemary Beach Owners Center<br />

Rosemary Beach Fl.<br />

down no longer exists, after the anti-short cycle and random start timers expire. Should a fault<br />

re-occur within 60 minutes after reset, then a permanent lockout will occur. A light emitting<br />

diode (LED) shall annunciate the following alarms: high refrigerant pressure, low refrigerant<br />

pressure, low water temperature and a high level of condensate in the drain pan (when<br />

equipped with the optional low water temperature and high level condensate sensors). The<br />

LED will display each fault condition as soon as the fault occurs. If a permanent lockout<br />

occurs, then the fault LED will display the type of fault until the unit is reset. Safety devices<br />

include a low pressure cutout set a 40 PSIG (280kPa) for loss of charge protection (freezestat<br />

and/or high discharge gas temperature sensor is not acceptable) and a high pressure cutout<br />

control set at 600 PSIG (4125 Kpa). An optional energy management relay that allows unit<br />

control by an external source shall be factory installed. A terminal block with screw terminals<br />

shall be provided for control wiring.<br />

2.2.6 Piping: Supply, return water and condensate drain connections shall be brass female pipe<br />

thread fittings and mounted flush to cabinet exterior with stainless steel, Braided hose kit with<br />

swivel connectors.<br />

2.2.7 Hot Gas Reheat: Provide factory hot gas reheat coil for humidity control.<br />

2.3 Controls: Room thermostat shall be low voltage, remote-mounted with sub-base and<br />

thermometer for controlling heating and cooling cycles. The fan selector shall include "AUTO-<br />

ON" controls. Provide automatic changeover thermostats with fan that run continuously during<br />

occupied mode. The room thermostats shall be manually adjustable by occupants and shall<br />

indicate setting and temperature in degrees Fahrenheit. Provide humidity sensor and set point<br />

control for hot gas reheat coil.<br />

2.4 GEOTHERMAL LOOPFIELD: The contractor shall design the geothermal loop field and<br />

provide a thermal performance guarantee. The contractor shall submit a list of 10 projects of<br />

equal or larger size. Loop field piping shall be HDPE with thermally fused joints. Pipe shall<br />

comply with ASTM D3035, ASTM D2683 for socket fusion fittings, and ASTM D3261 for<br />

butt/saddle fusion fittings. Pipe shall be pressure tested at pressure recommended by<br />

manufacturer. Test shall be witnessed by the engineer or owner’s representative. Provide 50<br />

year warranty on pipe and loop assemblies.<br />

3 EXECUTION<br />

3.1 Installation: Install in accordance with producer's printed instructions. Anchor housing to<br />

building with cadmium plated self-tapping screws, lag screws, or bolts, as directed by specific<br />

construction. All mounting supports shall be provided by Division 23. Provide painted sheet<br />

metal cover to protect unit from dripping from above.<br />

3.2 Cleaning: Clean tar and all other soil from housing exterior. Leave ready for Division 7,<br />

Caulking Work. Coordinate with general construction to ensure a water-tight seal.<br />

3.3 Condensate Drain: Pipe trapped copper condensate drain to the point of disposal as shown<br />

on the drawings. Pipe shall be full size of unit outlet. Refer to Division 23 section "Insulation"<br />

for pipe insulation.<br />

3.4 Startup: Check entire assembly for correctness of installation, alignment, and control<br />

sequencing. Start all component parts in proper sequence. Make all adjustments required to<br />

insure proper smooth quiet operation.<br />

END OF SECTION 23 81 46<br />

WATER-TO-AIR HEAT PUMPS 23 81 46 - 3/4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!