DAG Architects<br />

2041 Rosemary Beach Owners Center<br />

Rosemary Beach, FL<br />

B. Sealants: Latex, complying with ASTM C 834 Type OP, Grade NF and with applicable<br />

requirements in Section 079200 "Joint Sealants," recommended by sealant manufacturer and<br />

manufacturer of substrates for intended application.<br />

1. Sealants shall have a VOC content of 250 or less.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install solid-sawn wood roof decking to comply with AITC 112.<br />

1. Locate end joints for combination simple and two-span continuous lay-up.<br />

B. Apply joint sealant to seal roof decking at exterior walls at the following locations:<br />

1. Between roof decking and supports located at exterior walls.<br />

2. Between roof decking and exterior walls that butt against underside of roof decking.<br />

3. Between tongues and grooves of roof decking over exterior walls and supports at exterior<br />

walls.<br />

3.2 PROTECTION<br />

A. Provide water-resistive barrier over roof decking as the Work progresses to protect roof decking<br />

until roofing is applied.<br />

END OF SECTION 061516<br />

WOOD ROOF DECKING 061516 - 2