3.3 Piping Installation<br />

3.3.1 Install piping to allow for expansion and contraction.<br />

3.3.2 Isolate all copper tubing from steel and concrete by wrapping the pipe at the contact point, and<br />

for one inch on each side, with a continuous plastic sleeve. Isolate all copper tubing installed<br />

in block walls with a continuous plastic sleeve.<br />

END OF SECTION 23 01 00<br />