DAG Architects Inc<br />

12041 <strong>ROSEMARY</strong> <strong>BEACH</strong> OWNERS CENTER<br />

<strong>ROSEMARY</strong> <strong>BEACH</strong>, FL.<br />

A. More than one bid from an individual, firm, partnership, corporation or association under the<br />

same or different names will not be considered. Reasonable grounds for believing that the<br />

bidder is interested in more than one bid for the same work will cause rejection of all bids in<br />

which such Bidder is believed to be interested. Bids will be rejected if there is reason to believe<br />

that collusion exists between Bidders. Bids in which the price is obviously unbalanced may be<br />

rejected.<br />

1.12 OPENING OF BIDS<br />

A. Bids will be opened privately. Contractor will be notified at a later time.<br />

1.13 MODIFICATION AND WITHDRAWAL OF BIDS<br />

A. A submitted Bid may be substituted, replaced or withdrawn in its entirety, prior to the date and<br />

time designated for receipt of Bids, by notifying the party receiving the Bids at the place<br />

designated for receipt of Bids. Notification shall be in writing over the signature of the Bidder.<br />

Such notification shall be received by the end of the business day prior to the day designated to<br />

receive bids.<br />

1.14 EVALUATION AND CONSIDERATION OF BIDS<br />

A. It is the intent of the Owner to award the Contract to the lowest responsible Bidder provided<br />

the Bid has been submitted in accordance with the requirements of the Bidding Documents and<br />

does not exceed the funds available. The Owner shall have the right to waive informalities or<br />

irregularities in a Bid received and to accept the Bid, which in the Owner's judgment, is in the<br />

best interest of the Owner.<br />

B. The Owner reserves the right to award to other than the lowest responsible bidder if sufficient<br />

reasons exist that a bidder other than the lowest is more responsive. If the bid is not awarded<br />

to the lowest bidder, a full and complete statement of the reasons for awarding the contract<br />

otherwise shall be prepared by the Owner and filed with documents relating to the bid award.<br />

1.15 REJECTION OF BIDS<br />

A. The Owner reserves the right to waive minor defects in the process, to reject any or all Bids<br />

when such rejection is in the best interest of the Owner, to reject a Bid not accompanied by a<br />

Bid Security, or to reject a bid if not in the best interest of the Owner, or to reject a Bid, which<br />

is in any way irregular or incomplete.<br />

1.16 OWNER’S FINANCIAL CAPACITY<br />

A. The Owner shall furnish evidence that financial arrangements have been made to fulfill the<br />

Owner's obligations under the Contract to the Bidder under consideration for award of Contract,<br />

if requested, no later than seven days prior to the expiration of the time for withdrawal of bids.<br />

If reasonable evidence is not furnished, the Bidder will not be required to execute the<br />

Agreement between the Owner and the Contractor.<br />

1.17 SUBMITTAL<br />

A. The Bidder shall furnish to the Owner through the Architect in writing a designation of work to<br />

be done by his own forces, names of the manufacturers, products and suppliers of principal<br />

items or systems of materials and equipment proposed for the work, names of persons or<br />

entities proposed for the principal portions of the work.<br />

INSTRUCTIONS TO BIDDERS 00 21 13 -3