3.6 Remove shipping bolts and temporary supports within fans. Adjust dampers for free operation.<br />

3.7 Testing: After installation of fans has been completed, test each fan to demonstrate proper<br />

operation of units at performance requirements specified. When possible, field correct<br />

malfunctioning units, then retest to demonstrate compliance. Replace units which cannot be<br />

satisfactorily corrected.<br />

3.8 Cleaning: Clean factory-finished surfaces. Remove all tar and soil. Repair any marred or<br />

scratched surfaces with manufacturer's touch-up paint.<br />

END OF SECTION 23 34 00<br />

FANS 23 34 00 - 3/4