G. BridgeStructures, which are to span streams, shall be designed for hydraulicrequirements in accordance with this manual. Plans shall be submitted to thePublic Works Department for review and approval.All public or private bridges shall be designed to withstand HS-20 highwayloading unless otherwise approved by the Public Works Department and shallbe properly signed and sealed by a North Carolina Pr<strong>of</strong>essional Engineer.H. Roadway DamsIt is the policy <strong>of</strong> the <strong>Town</strong> <strong>of</strong> <strong>Kernersville</strong> to discourage the location <strong>of</strong>roadways on dams. In those cases, where a definite advantage may be gainedor a substantial savings in funds may be realized, the utilization <strong>of</strong> a dam for aroadway may be considered.Where it is determined that a dam will be utilized as a roadway, the followingcriteria must be met:1. When applicable, the dam must have certification from the NCDepartment <strong>of</strong> Natural Resources and Community Developmentpursuant to the "Dam Safety Law <strong>of</strong> 1967" (as amended by the GeneralAssembly <strong>of</strong> 1977).2. All pertinent data regarding the design <strong>of</strong> the embankment as animpoundment structure must be presented to the Public WorksDepartment for review.3. The top cross-section dimension must be the roadway section widthrequired (from right <strong>of</strong> way line to right <strong>of</strong> way line) for the facility plus aminimum <strong>of</strong> four (4) feet on each side.4. Guardrail will be provided on both sides <strong>of</strong> the roadway.5. Spillway will be designed to provide two (2) feet <strong>of</strong> freeboard for anestimated 100-year design frequency outflow as a minimum.6. A means <strong>of</strong> draining the lake completely will be provided.<strong>Design</strong> acceptance or approval by the <strong>Town</strong> is limited to the use <strong>of</strong> the dam asa roadway and is in no way intended as approval <strong>of</strong> the embankment as animpoundment structure.Responsibility incurred by the <strong>Town</strong> <strong>of</strong> <strong>Kernersville</strong> when a section <strong>of</strong> roadwaycrossing a dam is accepted as a part <strong>of</strong> the <strong>Town</strong>'s maintenance system islimited to maintenance <strong>of</strong> the roadway proper for vehicular traffic only.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!