11.07.2015 Views

Design & Construction Specifications - Town of Kernersville

Design & Construction Specifications - Town of Kernersville

Design & Construction Specifications - Town of Kernersville

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ase placement, another pro<strong>of</strong> roll may be required. It isthe responsibility <strong>of</strong> developer/owner to make corrections tothe subgrade when sections <strong>of</strong> the roadway fail the pro<strong>of</strong> rolltest.4. Curb & Gutter Placement Inspection - Periodic curb andgutter placement inspections will be conducted by theInspector to insure approved materials are being used andthe installation conforms to the standards found in thismanual and the NCDOT Standard <strong>Specifications</strong>. Thedeveloper/owner shall notify the Public Works Departmentbefore curb and gutter placement is scheduled to begin. Noconcrete will be placed until the forms and subgrade havebeen approved by the Inspector.5. Roadway ABC Stone Base Pro<strong>of</strong> Roll - The ABC stone basewill be pro<strong>of</strong> rolled by a loaded tandem dump truck providedby the developer/owner under inspection <strong>of</strong> the Public WorksDepartment. The developer/owner shall notify the PublicWorks Department before the pro<strong>of</strong> roll to set up anappointment with the Inspector. It is the responsibility <strong>of</strong>developer/owner to make corrections to the ABC stone baseand/or subgrade when sections <strong>of</strong> the roadway fail the pro<strong>of</strong>roll test.6. Plant Mix Asphalt Placement and Density Inspections -Periodic asphalt placement inspections will be conducted bythe Inspector to insure approved materials are being usedand the installation conforms to the standards found in thismanual and the NCDOT Standard <strong>Specifications</strong>. Thedeveloper/owner shall notify the Public Works Departmentbefore asphalt placement is scheduled to begin. TheInspector may require another ABC pro<strong>of</strong> roll if it has beenlonger than 72-hours since the last pro<strong>of</strong> roll, significantrainfall event, or base has been damaged.7. Sidewalk Placement Inspections - Periodic sidewalkplacement inspections will be conducted by the Inspector toinsure approved materials are being used and theinstallation conforms to the standards found in this manualand the NCDOT Standard <strong>Specifications</strong>. Thedeveloper/owner shall notify the Public Works Departmentbefore sidewalk placement is scheduled to begin. No

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!