11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>1.5.3 Federal Aviation AdministrationThe SELECTED VENDOR shall complete Federal Aviation Administration (FAA) <strong>for</strong>msas necessary. FAA required tower lighting on newly constructed towers shall be theresponsibility of the SELECTED VENDOR.1.5.4 <strong>Project</strong> ManagementA. The RESPONDENT shall provide a <strong>Project</strong> Management Plan which includes adetailed Work Breakdown Structure (WBS), project scope, deliverables,schedule, QA/QC processes, and risk management sections.B. The Plan shall describe how the SELECTED VENDOR intends to monitor andcontrol the installation and deployment of the proposed system and mitigate risksin order to ensure that the system meets the design specifications and isdelivered on time.C. Regularly scheduled status meetings shall be established between the <strong>County</strong><strong>Project</strong> Team and the SELECTED VENDOR. The SELECTED VENDOR shallprovide a schedule <strong>for</strong> these meetings subject to the approval of the <strong>County</strong>.1.5.4.1 SchedulingA. The SELECTED VENDOR shall develop and maintain a project scheduleincluding tasks, milestones, start and end dates, task prerequisites, and taskowners based on an approved WBS.B. The schedule shall represent tasks associated with completing work on all itemsidentified in the WBS. The project schedule shall be updated with actual dates astasks are completed.C. The updated schedule shall be provided as an agenda item <strong>for</strong> all weekly statusmeetings between the <strong>County</strong> and the SELECTED VENDOR.D. The schedule shall address the following at a minimum:1. Site surveys2. Detailed design review3. Site preparation4. Equipment manufacturingMay 27, 2011 Page 11 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!