11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>1.5.4.3 <strong>Project</strong> Punch ListA. The SELECTED VENDOR shall establish and maintain a punch list, as mutuallyagreed to with the <strong>County</strong>, <strong>for</strong> site facilities, equipment, and <strong>for</strong> acceptance tests.B. The punch list shall be maintained in real time and include the following at aminimum:1. Sequential punch list item number2. Date identified3. Item description4. The party responsible <strong>for</strong> resolution5. Expected resolution date6. Resolution date7. Full details about how each punch list item was resolved and tested8. Notes about the item.C. If responsibility <strong>for</strong> resolving an item is transferred to another person or group, anew entry shall be added to the punch list and the original entry shall beappropriately noted.D. The SELECTED VENDOR shall be responsible <strong>for</strong> reviewing each punch listitem, and advising the <strong>County</strong> of any changes. The status of punch list itemsshall be updated during each weekly status meeting.E. Software/Firmware updates must be thoroughly regression tested prior to beingreleased and implemented.F. Software updates must include release in<strong>for</strong>mation identifying the changesmade, either to repair a problem or enhancements made.1.5.4.4 <strong>Project</strong> StaffingA. <strong>Project</strong> staffing shall be managed by the SELECTED VENDOR based onworkload and the level of ef<strong>for</strong>t throughout the implementation / installationprocess; however, the positions identified below shall be staffed throughout theduration of the project and shall not be changed without prior approval by the<strong>County</strong>.May 27, 2011 Page 13 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!