11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>b. A utility sensing interface shall be used, stepping down systemvoltage of 120/240 VAC 1 phase to 24VAC, helping to protect theprinted circuit board from voltage spikes and increasing personnelsafety when troubleshooting.2. Controls shall signal the generator set to start in the event of a powerinterruption.a. A solid state time delay start, adjustable, from 0.1 to 10 seconds,shall delay this signal to avoid nuisance start-ups on momentaryvoltage dips or power outages.3. Controls shall transfer the load to the generator set after it reaches propervoltage.4. Controls shall retransfer the load to the line after normal power restoration.a. A return to utility timer, adjustable from 1-30 minutes, shall delay thistransfer to avoid short term normal power restoration.5. The operating power <strong>for</strong> transfer and retransfer shall be obtained from thesource to which the load is being transferred.6. Controls shall signal the generator to stop after the load retransfers tonormal.a. A solid state engine cool down timer, adjustable from 1-30 minutes,shall permit the engine to run unloaded to cool down be<strong>for</strong>eshutdown.b. Should the utility power fail during this time, the switch willimmediately transfer back to the generator.7. Controls shall be capable of automatic generator start-up and shut-down to“exercise” the generators. Exercise schedules shall be user programmableto allow day and time of exercise to be set.8. The transfer switch shall have a time delay neutral feature to provide a timedelay, adjustable from 0.1-10 seconds, during the transfer in eitherdirection, during which time the load is isolated from both power sources.This allows residual voltage components of motors or other inductive loads(such as trans<strong>for</strong>mers) to decay be<strong>for</strong>e completing the switching cycle.9. A switch will be provided to bypass all transition features when immediatetransfer is required.May 27, 2011 Page 63 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!