11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>1. The CATP shall be consistent with the procedures and guidelines outlinedin TSB-88C latest revision.2. Coverage testing shall commence only after the radio system is fully testedand aligned. Significant changes to the system will require retesting ofcoverage at the <strong>County</strong>’s discretion.3. The SELECTED VENDOR shall per<strong>for</strong>m two types of coverage testing:a. Automated objective mobile drive testingb. Non-automated subjective DAQ testing (intelligibility testing)Automated and intelligibility testing shall be complementary and serve tofully verify that coverage requirements are met both technically andoperationally.4. Test Configurations:a. Testing configurations <strong>for</strong> automated and intelligibility testing shallrepresent typical operating configurations to the greatest extentpossible, using portable and mobile radio equipment to be used withthe system.b. Automated Objective Mobile Drive Testing:1) The SELECTED VENDOR shall test both the signal leveland Bit Error Rate (BER), as applicable, at a statisticallysignificant number of test locations throughout the <strong>County</strong>utilizing automated test equipment such as an STI-9400 orequivalent.2) Inaccessible grids shall not count as either a pass or fail inthe statistical analysis.c. Non-Automated Subjective DAQ Testing:1) Non-Automated subjective DAQ coverage testing shall beconducted using typical portable radios supplied with thesystem.2) Talk-out and talk-in per<strong>for</strong>mance shall be documented.3) The SELECTED VENDOR shall provide a standardizedtest <strong>for</strong>m <strong>for</strong> testing.May 27, 2011 Page 90 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!