11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>3.5.2.1 RepeatersA. General:1. Base station equipment shall be solid state in design and function withstandard site conditions <strong>for</strong> temperature, altitude, and humidity.2. Equipment shall have alarm interfaces to provide status to the NetworkManagement System3. The units shall be as compact as possible, with mounting configurations <strong>for</strong>standard relay rack or cabinets.4. The units shall consist of modular components or Field Replaceable Unitsallowing <strong>for</strong> in the field repairs whenever possible.B. Base station equipment shall comply with Part 90 of the FCC Rules andRegulations, as well as appropriate EIA and similar agency standards and beFCC type accepted <strong>for</strong> the appropriate frequency band.C. Prior to implementation, the SELECTED VENDOR shall per<strong>for</strong>m the followingstudies at each site:1. Intermodulation analysis – The SELECTED VENDOR shall considerequipment from all tenants located at the proposed site, per FCC licensedin<strong>for</strong>mation.2. Maximum Permissible Exposure (MPE) study (per latest revision of OETbulletin 65) – The SELECTED VENDOR shall consider equipment from alltenants located at the proposed site, per FCC licensed in<strong>for</strong>mation.D. The SELECTED VENDOR shall resolve all issues predicted during theintermodulation analysis and MPE studies. If an intermodulation problem isidentified following implementation, the SELECTED VENDOR shall resolve theissue without degrading system coverage or per<strong>for</strong>mance, <strong>for</strong> a period of up to12 months after final acceptance at no cost to the OWNER.E. RESPONDENT shall include detailed specification sheets <strong>for</strong> all proposedequipment.F. A single duplexer shall be utilized <strong>for</strong> the Paging and Interoperability Channel ateach site.May 27, 2011 Page 33 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!