11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>1. The <strong>County</strong> shall conduct an inspection of the installations upon substantialcompletion. Any deficiencies shall be documented on a single punch listand provided to the Contractor <strong>for</strong> resolution.2. Final acceptance testing shall not commence until all punch list items areresolved.11.5 FleetmappingA. The SELECTED VENDOR shall develop the actual fleetmap with input anddirection from the <strong>County</strong>. The fleetmap shall contain at a minimum:1. Talkgroup ID2. Agency3. Emergency actions4. Encryption capability5. Roaming capability6. PriorityB. The SELECTED VENDOR shall also develop subscriber programmingtemplates. These templates shall have the basic features and functions defined<strong>for</strong> a particular subscriber and user type. Templates shall be developed on a peragency basis.C. Prior to programming subscriber units, a set of radios shall be programmed witheach template. The <strong>County</strong> will test these radios and approve or recommendchanges to the templates.D. Once the fleetmap and templates are approved and completed, the SELECTEDVENDOR shall use these <strong>for</strong> installation of subscribers and <strong>for</strong> furtherconfiguration of the system. The contractor shall submit these with the final asbuiltdocumentation.11.6 Coverage TestingA. RESPONDENT shall submit a preliminary Coverage Acceptance Test Plan(CATP) with the Proposal. The final CATP shall be submitted during the FinalDesign stage of the project.B. CATP:May 27, 2011 Page 89 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!