11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>hardware, adapters and or connections to deliver a complete operable system tothe <strong>County</strong> at the time of acceptance.B. All installations shall be per<strong>for</strong>med by factory authorized or SELECTEDVENDOR affiliated service shops. Other shops or installers may be used uponmutual agreement between the <strong>County</strong> and the SELECTED VENDOR. Qualified,adequately trained personnel familiar with this type of work shall per<strong>for</strong>m allinstallations. Vendors shall provide the names of the service shops, a summaryof their experience and a list of five references (minimum) <strong>for</strong> each proposedshop.C. Prior to the start of the system installation the SELECTED VENDOR shallparticipate in a mandatory project site survey with the <strong>County</strong>’s representative toconfirm actual equipment location within each space. At that time the exactequipment locations will be determined and documented by the SELECTEDVENDOR.D. The INSTALLATION CONTRACTOR shall coordinate with others, asappropriate, to confirm that any prep work that affects the installation of the basestation equipment, such as tower work, coring, bracing, conduit, electrical, etc., iscomplete be<strong>for</strong>e final inspection.E. The SELECTED VENDOR shall provide and pay <strong>for</strong> all materials necessary <strong>for</strong>the execution and completion of all work. Unless otherwise specified, allmaterials incorporated into the permanent work shall be new and shall meet therequirements of this RFP. All materials furnished and work completed shall besubject to inspection by the <strong>County</strong> or the <strong>County</strong>’s Engineer.F. Equipment supplied as spare equipment may not be used <strong>for</strong> installation of theproposed system. All spare equipment must be supplied in an unused condition.G. All equipment and devices shall be cleaned internally and externally, and alldamaged finishes shall be repaired.H. Worksites shall be left neat and broom swept upon completion of work each day.All shelter floors will be thoroughly cleaned and all scuff marks and abrasions willbe removed prior to acceptance. All trash shall be removed weekly.I. Inspection:May 27, 2011 Page 88 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!