11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>e. Per<strong>for</strong>m a simulation of power failure to test generator start up andATS to pick up building load correctly.f. Return to commercial power and test generator and ATS todemonstrate correct cycling to normal commercial power.g. Per<strong>for</strong>m a load test of the generator, to ensure full load frequencyand voltage is within specification by using building load. This testshall be run <strong>for</strong> a minimum of one hour.h. Test and verify all remote indicators and controls.2. The SELECTED VENDOR shall provide complete report(s) of all testingper<strong>for</strong>med.6.4.1 Propane GeneratorA. The prime motor shall be a liquid cooled, propane gas fueled, naturally aspiratedengine of 4-cycle design.B. The engine shall have sufficient horse power rating to drive the generator to fulloutput power without a gear box between the engine and generator.C. The engine shall have a battery charging DC alternator with a solid state voltageregulator.D. The alternator shall be protected by internal thermal overload protection and anautomatic reset field circuit breaker.E. One step load acceptance shall be 100% of generator set nameplate rating andmeet the requirements of NFPA 110 paragraph 5-13.2.6.F. The electric plant shall be mounted with vibration isolators on a welded steelbase that shall permit suitable mounting to any level surface.G. A main line output circuit breaker carrying the UL mark shall be factory installed.H. An alternator strip heater shall be installed to prevent moisture condensationfrom <strong>for</strong>ming on the alternator windings.I. Controls:1. All engine alternator controls and instrumentation shall be designed, built,wired, tested and shock mounted in a NEMA 1 enclosure mounted to theMay 27, 2011 Page 59 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!