11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong><strong>for</strong> 150 percent of the building’s required cooling capacity, as determined bythe BTU analysis.2. The SELECTED VENDOR shall per<strong>for</strong>m BTU analysis (heat loadcalculations) <strong>for</strong> all shelter equipment during preliminary design to verifyHVAC system size. All calculations shall include a 50% expansion factor,and all assumptions regarding power consumption, duty factor, and heatloading shall be thoroughly explained.3. Each unit shall be sized to maintain an inside ambient temperature rangebetween 65 and 85 degrees F when the outside temperature is between -10and 100 degrees F.O. Grounding:1. A halo ground system shall be installed utilizing #2/0 AWG stranded copperwire with down conductors at each corner.2. A 1” Schedule 40 PVC sleeve shall be installed at 45 degrees through walls<strong>for</strong> ground exits.3. Ground bar kits shall be included with interior and exterior ground buss barsand exterior copper straps shall be located at the cable entry port.P. Antenna cable conduit entry – A bulkhead panel shall be supplied toaccommodate coaxial transmission lines between 1/2” and 1 5/8” diameterelliptical waveguides. A minimum of 12 transmission lines shall beaccommodated with 4” openings. The building manufacturer shall seal theconduits into the wall to assure that they are watertight. All unused entranceports shall be sealed with a removable insert.Q. Cable tray – All new shelters will be equipped with cable trays. The SELECTEDVENDOR or subcontractor shall supply and install up to 60’ of 18” wide cableladder/tray.R. One 4’ x 6’ x 3/4” TELCO board shall be installed.S. Shelters shall be supplied with at least one 10 pound CO 2 fire extinguisher, anapproved eye wash station and first aid kit.May 27, 2011 Page 56 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!