11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>11.3 StagingA. Each individual assembly or equipment unit shall undergo factory testing prior toshipment.B. Standard factory test documentation, documenting the tests per<strong>for</strong>med andindicating successful completion of testing shall be submitted to the <strong>County</strong>.C. System Staging:1. The complete system shall be staged and tested at the factory, in theUnited States, to the greatest extent practical. The intent of the staging testsis to demonstrate to the <strong>County</strong> that the system is ready <strong>for</strong> shipment andinstallation.2. The Staging Acceptance Test Plan, documenting tests to be per<strong>for</strong>medduring Staging, shall be approved by the <strong>County</strong> prior to System Staging.3. The SELECTED VENDOR shall provide all necessary technical personnel,and test equipment to conduct staging tests. All deviations, anomalies, andtest failures shall be resolved at the Vendor's expense.4. The SELECTED VENDOR shall use an approved Staging Acceptance TestPlan (SATP). It is expected that the SATP has been per<strong>for</strong>med and all testshave been successful be<strong>for</strong>e the <strong>County</strong> witnesses the official SATP. TheSATP shall be signed and dated by the Vendor and <strong>County</strong> representativesfollowing completion of all tests. All tests in the SATP shall be marked aseither pass, fail, or pass qualify.5. Failed tests shall be documented, corrected, and retested. All defectivecomponents shall be replaced and retested. Defective components thatcannot be corrected shall be replaced at the expense of the Vendor.6. Retest of individual failed SATP tests or the entire plan shall be at the<strong>County</strong>’s discretion.7. The fully executed, completed and signed SATP document shall beprovided to the <strong>County</strong>.11.4 System InstallationA. Installation shall consist of a complete, tested, system to include placement ofassociated cabling, appropriate system layout and terminal connections. TheSELECTED VENDOR shall provide associated power supplies and any otherMay 27, 2011 Page 87 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!