11.07.2015 Views

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

Caroline County, Virginia Request for Proposals Project 25 Radio ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UHF/700 MHz P<strong>25</strong> <strong>Radio</strong> Communications System<strong>Request</strong>ion <strong>for</strong> <strong>Proposals</strong><strong>Caroline</strong> <strong>County</strong>, <strong>Virginia</strong>3. NFPA 70 with particular attention to Article 700, “Emergency Systems”4. NFPA 110 Requirements <strong>for</strong> Level 1 Emergency Power Supply System5. NFPA 101 - Code <strong>for</strong> Safety to Life From Fire in Buildings and Structures6. ANSI/NEMA MG 1 - Motor and Generators7. ANSI/NEMA AB 1 - Molded Case Circuit Breakers8. ANSI/NEMA <strong>25</strong>0 – Enclosures <strong>for</strong> Electrical Equipment (1000 voltsmaximum)G. Labeling and Identification – All wiring harnesses and connectors shall be clearlyidentified by number and function according to the associated schematicdiagrams and documentation provided by the SELECTED VENDOR.H. Factory Testing:1. Be<strong>for</strong>e shipment of the equipment, the generator set shall be tested underrated load <strong>for</strong> per<strong>for</strong>mance and proper functioning of control and interfacingcircuits. Tests shall include:a. Verification of all safety shutdowns are functioning properlyb. Verification of single step load pick-up per NFPA 110-1996,Paragraph 5-13.2.6c. Verification of transient and voltage dip responses and steady statevoltage and speed (frequency) checksd. Full load test <strong>for</strong> a minimum of one hour2. Provide complete report(s) of all testing per<strong>for</strong>med.I. Startup and Checkout:1. The supplier of the electric generating plant and associated items coveredherein shall provide factory trained technicians to check out the completedinstallation and to per<strong>for</strong>m an initial startup inspection to include:a. Ensuring the engine starts (both hot and cold) within the specifiedtime.b. Verify engine parameters are within specification.c. Verify that no load frequency and voltage adjusting is required.d. Test all automatic shutdowns of the generator.May 27, 2011 Page 58 of 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!