CITY OF HOQUIAM<strong>2009</strong>-20<strong>10</strong> BIENNIAL OPERATING BUDGETDepartment Accomplishments and GoalsDepartment: Street Department Director: WattersDepartment Number: 19 Fund: <strong>10</strong>62007-2008 Accomplishments:1. Staff spent 445 hours assisting <strong>City</strong> Electrician with various projects, and over 70 hoursassisting Parks, Police and Water department. Most <strong>of</strong> the hours are charged to the General Fund(Street) account.2. The Street crew have been busy trying to maintain and replace defective and weatheredsignage to ensure the safety <strong>of</strong> the citizens.3. Mowed and cleaned open ditches along roads and streets. Also continue to sweep alleys andstreets within the <strong>City</strong>.4. Tried to maintain the graveled alleys and roads within the <strong>City</strong>. Had to rent the city <strong>of</strong>Aberdeen's grader. Our grader has not operated sense March5. Conducted a vegetation spraying operation on streets and roads.6. Worked on street repairs from dig-outs, catch basin replacements and sink holes.7. Continue to keep roads clear <strong>of</strong> ice, debris and water due to plugged catch basins and hightides.8. Continue to keep roads, streets, alleys and ditches clear <strong>of</strong> illegal dumping which consists <strong>of</strong>yard waste, household waste and raw garbage.9. Removed existing sidewalks and driveways as they were being replaced by homeowners.Street crew has removed bad areas in sidewalks on Sumner & Simpson and a 4 person sidewalkcrew has replaced them.<strong>10</strong>. Removed trees from parking strips as requested.11.Patch holes in asphalt alleys ( need to patch more)Goals for the <strong>2009</strong>-20<strong>10</strong> Biennium:1. Replace grader ! Looking at used ones ( A new grader is about $180,000 & up.2. Continue to maintain clean and safe wearing surfaces with signage for public safety.3. Continue the program <strong>of</strong> street sweeping and mowing to keep debris <strong>of</strong>f <strong>of</strong> street surface andalong roadways.4. Continue the program <strong>of</strong> maintenance <strong>of</strong> roadside vegetation through mowing and pesticideapplication for weeds.5. Continue to maintain the catch basins and open ditches to ensure storm water run<strong>of</strong>f <strong>of</strong> streets.6. Work on curb replacement program to assist in the management <strong>of</strong> surface water run<strong>of</strong>f <strong>of</strong>streets.7. Respond to all kind <strong>of</strong> weather such as rain, wind, snow, ice and other debris on streets androads.8. Respond to flagging needs at any time—day or night.9. Continue with the removal and disposal <strong>of</strong> illegal dumping <strong>of</strong> yard waste, household waste andraw garbage.<strong>10</strong>. Continue with the removal <strong>of</strong> trees when needed, and look at the kind <strong>of</strong> trees that should beplanted in parking strips.185

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!