12.07.2015 Views

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CITY OF HOQUIAM<strong>2009</strong>-20<strong>10</strong> BIENNIAL OPERATING BUDGETDepartment Accomplishments and GoalsDepartment: Water Department Director: TeleckyDepartment Number: 25 Fund: 4012007-2008 Accomplishments:1. Installed 1670 linear feet <strong>of</strong> 2" plastic pipe to replace old 2" pipe in the distribution system.2. Installed 74 linear feet <strong>of</strong> 8" ductile iron pipe to replace old pipe in the distribution system.3. Installed <strong>10</strong>45 linear feet <strong>of</strong> 2" plastic pipe and <strong>10</strong>31 linear feet <strong>of</strong> 3/4" plastic pipe at cemetery.4. Replaced 11 distribution system gate valves ( three 1 1/2”, fifteen 2”, seven 6”, two 8” ; two 14" and one 18').5 Repaired 48 fire hydrants.6 Replaced 8 fire hydrants.7. Flushed 604 fire hydrants.8. Performed maintenance or repair to 153 service water lines.9. Repaired 33 distribution system waterline leaks.<strong>10</strong>. Replaced 161 water service meters.11. Retr<strong>of</strong>itted eight water service meters.12. Flow tested/calibrated 25 industrial water service meters.13. Completed <strong>10</strong>50 requests for water service activations.14. Completed 811 requests for water service terminations.15. Completed 1547 water services shut-<strong>of</strong>fs for delinquency.16. Investigated 117 water service inquiries related to high water consumption.17. Investigated 33 water service inquiries related to water quality.18. Installed 9 new meter services.19. Drained, cleaned and inspected Beacon Hill reservoir and tank.20. Inspected College Hill reservoir by Inland Potable Services, Inc.21. Monitored 261 customer cross-connections with backflow prevention assemblies.22. Maintained and tested 48 city owned cross connections with backflow prevention assemblies.23. Replaced three chemical feed pumps at the Water Treatment Plant.24. Rebuilt raw water pump and motor at Water Treatment Plant.25. Replaced raw water meter at Water Treatment Plant.26. Produced 587,092,300 gallons <strong>of</strong> treated water for consumption (1.5 MGD average).27. Conducted 186 WA State Department <strong>of</strong> Health mandated water quality monitoring tests.28. Performed 331 utility located requests for identifying <strong>City</strong> waterlines.29. Updated SCADA system at Water Treatment Plant.30. Replaced ro<strong>of</strong> at Water Treatment Plant.Goals for the <strong>2009</strong>-20<strong>10</strong> Biennium:1. Continue to provide the citizens <strong>of</strong> <strong>Hoquiam</strong> with the level <strong>of</strong> service and quality and capacity <strong>of</strong> potable water.2. Initiate the process on drilling test well near Water Treatment Plant.3. Initiate the process <strong>of</strong> replacing the transmission waterline.4. Install system on increasing the water pressure on Arnold Court and Semler Court.5. Initiate the process on managing the silt behind the West Fork Dam. "Replace Sluice Gate"6. Perform stabilization at West Fork Dam.7. Replace intake screen at West Fork Dam.8. Replace generator at College Hill pump station.9. Flow test industrial water meters and continue replacing residential meters to ensure accurate consumptionreadings.<strong>10</strong>. Continue to maintain and protect the Davis Creek and West Fork watersheds.195

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!