12.07.2015 Views

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CITY OF HOQUIAM<strong>2009</strong>-20<strong>10</strong> BIENNIAL OPERATING BUDGETDepartment <strong>Budget</strong> NarrativeDepartment: Sewer Department Director: WattersDepartment Number: 26 Fund: 401Program Description:The Wastewater Treatment Plant, sanitary and storm sewer systems fall under the Street/SewerDepartment. This Department is part <strong>of</strong> the Public Works and has a foreman and 9 member crew.The crew is made up <strong>of</strong> wastewater treatment plant operators, pump station technicians,equipment operators and maintenance personnel.The Wastewater Treatment Plant has a rated capacity <strong>of</strong> 4.0 mgd average flow and an 8.0 mgdpeak flow. The plant is impacted during rainy weather with peak inflow/infiltration (I/I) flows. Withgood operational procedures <strong>of</strong> diverting the excess flows into the 48 acre lagoon, the operatorshave successfully managed the I/I flows. The plant operators have been awarded certificates forplant operation through the Department <strong>of</strong> Ecology. There are two plant operators and twobackup operators who services the pump stations and fill in at the treatment plant as needed.The sanitary sewer collection system consists <strong>of</strong> approximately 60 miles <strong>of</strong> gravity collectors andmains, and is serviced by 12 pump stations. There are approximately 3,020 residential services.Mission:The <strong>City</strong> crews are committed to improving the quality <strong>of</strong> life for the citizens <strong>of</strong> <strong>Hoquiam</strong>. The cityhas a Wastewater Treatment Plant Facility Study Draft Plan that well help to look at the overallWastewater Management Alteratives for pump stations, pressure line piping replacement,lagoonmodifications, biosolids removal, and including aging infrastucture at the WWTPand needs to becompleted. <strong>City</strong> crews are looking for ways to deal with inflow (storm water coming from openpipes into sanitary sewer lines) and infiltration (groundwater coming through cracks in pipes, joints,manholes). Continue review <strong>of</strong> overall maintenance costs, effectiveness <strong>of</strong> collection systems,pump stations and Plant operations.198

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!