12.07.2015 Views

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CITY OF HOQUIAM<strong>2009</strong>-20<strong>10</strong> BIENNIAL OPERATING BUDGETDepartment Accomplishments and GoalsDepartment: Stormwater Department Director: WattersDepartment Number: 27 Fund: 4012007-2008 Accomplishments:1.Installed varible speed drive at 28th St. sanitary and storm pump operate from the varible driveand works great ! The storm lines on cherry Street are now dry most <strong>of</strong> the time.2. Through August <strong>of</strong> 2008, over 700 hours <strong>of</strong> staff time was spent assisting electrician and over150 hours <strong>of</strong> staff time was spent assisting Parks, Police and Water Departments.3. The collection crew has provided system maintenance, replaced catch basins and added newbasins as needed, while also accomplishing the tasks normally assigned to this position.4. Collection crew has been cleaning storm lines, using vactor truck, digging ditches with backhoeand using camera in lines.5. Crew has been working on storm maps <strong>of</strong> old sanitary system, which is now storm and mainstorm lines.6. We have kept roads, streets, alleys and ditches clear <strong>of</strong> illegal dumping which consisted yardwaste, household waste and raw garbage.Goals for the <strong>2009</strong>-20<strong>10</strong> Biennium:1.Replace grader! We have about 16 miles <strong>of</strong> gravel roads, alleys and shoulders.Looking at usedones. (A new grader is about $180,000 and up) ( split cost between Street & Storm )2. Install storm pump station at Ramer and Polk Street. At this time the area near the Ramersanitary station is a gravity flow to the river for storm water removal. High tides back up in thestorm lines and cause some flooding. Placement <strong>of</strong> a storm pump with piping and the repair <strong>of</strong>discharge tide gate to the river, would remove flooding problems for the area from Chenault Ave.to Dion Ave. between Lincoln and Roosevelt St.3.Install varible speed drives at K St. sanitary pump station( can be used for storm pump also)4.Install varible speed drive at Queen sanitary pump station ( can be used for storm pump also)5.Install varible speed drive at Ramer sanitary pump station( can be used for storm pump also)6. Complete an assessment <strong>of</strong> dike systems around the city. These dikes protect large areas <strong>of</strong><strong>Hoquiam</strong> from high water levels in the river. The dikes have not been regularly maintained nor isthere an accurate inventory <strong>of</strong> the condition <strong>of</strong> these dikes.7. Need replacement pumps for Queen and Adams storm pump stations.8. Look at adding dikes, tide gates and pumps to part <strong>of</strong> Woodlawn and areas <strong>of</strong> Endresen Road.9. Continue the high level <strong>of</strong> maintenance and cleaning lines to ensure the efficient operation <strong>of</strong>the storm water collection and pump stations.<strong>10</strong>. Continue to work on good operational procedures on investigation <strong>of</strong> illegal sewage hook-upsto storm lines.203

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!