12.07.2015 Views

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

2009-10 Adopted Budget - City of Hoquiam

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY OF HOQUIAM<strong>2009</strong>-20<strong>10</strong> BIENNIAL OPERATING BUDGETDepartment Accomplishments and GoalsDepartment: Sewer Department Director: WattersDepartment Number: 26 Fund: 401<strong>2009</strong>-20<strong>10</strong> Accomplishments:1. Provided a well maintained WasteWater Treatment Plant. Operators have been awardedoperation certificate from the Department <strong>of</strong> Ecology in July 2008 for plant operations, whichshows what a great job they are doing with the age <strong>of</strong> the equipment and plant.2. The new sodium bi-sulfate dechlorination system and new building at the end <strong>of</strong> the chlorinecontact tank, were completed in the first part <strong>of</strong> 2007.3.The installation <strong>of</strong> a inline flow meter at the Wastewater Treatment was installed by in October2007.4. The <strong>Hoquiam</strong> River crossing Phase I and Phase II for the waste water pressure line, from theeast to west <strong>of</strong> 28th St. to K Street pump station, and Rognlins INC. OF Aberdeen has the Bidand should start on the project in October <strong>of</strong> 2008.5. The variable drive units at 28th and Bay sewer pump station was completed in 2007.6. Working on Inflow/Infiltration (I/I) using portable flow meters in sanitary sewer lines and ongoinginvestigation <strong>of</strong> storm going into sanitary lines.7. Pump station operator has been cleaning and inspecting pumps and motors as time allows.8. Collection crew cleaning lines with vactor truck and checking for grease in lines as time allows,and the approximate 450 hours <strong>of</strong> working in/for other departments, crew is doing their best tokeep up with daily work and complete maintenance work as time allows.Goals for the <strong>2009</strong>-200<strong>10</strong> Biennium:1. Complete Waste Weter Treatment Plant facility study (General Sewer Plan)2. Remove Bio-Solids from Lagoon IN <strong>2009</strong>. ( Big Job)3. To inspect Outfall from WWTP IN <strong>2009</strong> as REQUIRED by our NPDES Permit.4. Install new variable speed drives at K St. sanitary pump station in <strong>2009</strong>.5.Istall new variable speed drive at 2nd & Bayview sanitary pump station in 20<strong>10</strong>.6. Replace generator at Queen Ave. pump station ( to run sewer& storm pumps )in <strong>2009</strong>.7.Replace generator at Ramer Ave. pump station ( to run sewer & storm pumps) in <strong>2009</strong>.8.Rplace sewer Force Main from Adams Street to the lagoon in 20<strong>10</strong>.9. Install new variable speed drives at Queen Ave. pump station ( well be able to run a stormpump also) in 20<strong>10</strong>.<strong>10</strong>. Install new variable speed drive at Ramer Ave. pump station ( well be able to run a stormpump also) in 20<strong>10</strong>.11.Install a programmable feeder for grease control at 28th St. pump station in <strong>2009</strong>.199

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!