29.12.2016 Views

emerson-300510en-users-manual

Emerson Tank Gauging System

Emerson Tank Gauging System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rosemount Raptor<br />

System Configuration Manual<br />

300510EN, Rev AA<br />

December 2010<br />

7. Configure the Slave Database with Modbus addresses for the new level<br />

gauge and ATD devices, see “Installing a Rosemount 2160 FCU” on<br />

page 5-25 for more information.<br />

8. Install and configure a Rosemount 2410 Tank Hub and the field devices<br />

connected to the Tankbus as described in “Installing a Rosemount 2410<br />

Tank Hub” on page 5-38.<br />

9. Install a tank and associate the new 2410 to the tank as described in<br />

“Installing a Tank” on page 5-101.<br />

Now the new tank and field devices are installed and configured and will<br />

appear in the TankMaster workspace.<br />

5-116 Section 5. Installing a Raptor Level Gauging System

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!