29.12.2016 Views

emerson-300510en-users-manual

Emerson Tank Gauging System

Emerson Tank Gauging System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

System Configuration Manual<br />

300510EN, Rev AA<br />

December 2010<br />

Rosemount Raptor<br />

Tank position 4 is added<br />

11. Verify that a new tank position appears in the right-hand pane of the Tank<br />

Database window. In the example above, the new devices are mapped<br />

to tank position 4, and a tank position was added to the list of tanks in<br />

order to allow configuration of tank name and Modbus addresses for the<br />

new devices.<br />

Section 5. Installing a Raptor Level Gauging System<br />

5-119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!