29.12.2016 Views

emerson-300510en-users-manual

Emerson Tank Gauging System

Emerson Tank Gauging System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

System Configuration Manual<br />

300510EN, Rev AA<br />

December 2010<br />

Rosemount Raptor<br />

Figure 5-1. Raptor system<br />

installation procedure<br />

TankMaster<br />

workstattion<br />

Plant Host<br />

Computer<br />

1. Communication setup.<br />

See “Communication Protocol Setup” on<br />

page 5-6.<br />

Rosemount 2180<br />

Field Bus Modem<br />

2. Preferences.<br />

See “Preferences” on page 5-16.<br />

GROUP BUS<br />

Rosemount 2160 Field<br />

Communication Unit<br />

3. Rosemount 2160 Field<br />

Communication Unit installation and<br />

configuration.<br />

See “Installing a Rosemount 2160 FCU”<br />

on page 5-25.<br />

Rosemount<br />

5900S Radar<br />

Level Gauge<br />

FIELD BUS<br />

Rosemount 2240S<br />

Multi-Input<br />

Temperature<br />

Transmitter<br />

Rosemount 2410<br />

Tank Hub<br />

4. Rosemount 2410 Tank Hub installation<br />

and configuration.<br />

See “Installing a Rosemount 2410 Tank<br />

Hub” on page 5-38.<br />

TANKBUS<br />

5. Device installation and configuration.<br />

See for example “Installing a Rosemount<br />

5900S Radar Level Gauge” on page 5-51<br />

and “Installing Auxiliary Tank Devices” on<br />

page 5-65.<br />

6. Tank installation and configuration.<br />

See “Installing a Tank” on page 5-101.<br />

Rosemount 2230<br />

Graphical Field<br />

Display<br />

7. Calibration.<br />

See “Level Gauge Calibration” on<br />

page 5-122.<br />

Section 5. Installing a Raptor Level Gauging System<br />

5-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!