29.12.2016 Views

emerson-300510en-users-manual

Emerson Tank Gauging System

Emerson Tank Gauging System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rosemount Raptor<br />

System Configuration Manual<br />

300510EN, Rev AA<br />

December 2010<br />

7. Select the Tank Database tab:<br />

New Devices<br />

8. Verify that the new devices connected to the Tankbus appear in the<br />

Device Type column. Devices that appear in the list are communicating<br />

properly on the Tankbus. Devices supported by the Raptor system will<br />

automatically be identified by the 2410.<br />

9. Ensure that the devices to be associated with the new tank are marked<br />

“Not Configured” in the Tank Position column.<br />

10. Map the new devices to a tank in the Tank Position column by selecting<br />

the appropriate number in the drop-down list.<br />

5-118 Section 5. Installing a Raptor Level Gauging System

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!