2018 Adopted Annual Operating & Capital Improvement Budget
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BUILDING SERVICES<br />
Variance Justification<br />
Personnel (+$57,794):<br />
<br />
Salary and Benefits (+$48,701): One additional FTE Facility Services Worker to provide cleaning<br />
services for the Maintenance Facility, Fleet Building, and three new hardwalled bathrooms in the parks<br />
that will be constructed in <strong>2018</strong>.<br />
Purchased Services (-$22,192):<br />
<br />
<br />
<br />
Repair/Maintenance Services (-$31,000): Elimination of contract cleaning services at the Maintenance<br />
Facility and Fleet Building with the transition of this cleaning to the proposed new FTE Facility Services<br />
Worker. The 2019 proposed budget will reflect a reduction of $8,841 for the elimination of the port-o-let<br />
servicing costs for the 3 locations where hardwalled bathrooms are proposed to be fully constructed in<br />
<strong>2018</strong>.<br />
Repair/Maintenance Services (+$3,700): Increased cost of pumping septic system at Village<br />
Greens with addition of additional bathroom.<br />
Repair/Maintenance Services (+$3,700): Increased cost of unclogging drain systems at City<br />
facilities, based on actual costs experienced.<br />
Supplies/Non-<strong>Capital</strong> Equipment (-$19,035):<br />
Non-<strong>Capital</strong> Equipment (-$35,000): Completion of City Hall security camera replacement in 2017.<br />
<br />
<br />
<br />
Non-<strong>Capital</strong> Equipment (-$15,400): Replacement of chairs and tables in City Hall lobby, tables in<br />
Community Room, and table and chairs in Maintenance Facility lunchroom in 2017.<br />
Non-<strong>Capital</strong> Equipment (-$10,500): Replacement of water fountains with bottle fills at City facilities in<br />
2017.<br />
Non-<strong>Capital</strong> Equipment (+$12,000): Installation of new gutters and downspouts at City Hall and<br />
Evidence Building in <strong>2018</strong>.<br />
Non-<strong>Capital</strong> Equipment (+$15,000): Installation of new HVAC controls at City facilities in <strong>2018</strong>.<br />
Non-<strong>Capital</strong> Equipment (+$2,000): Installation of 2 urinals at Village Greens Park completed in 2017.<br />
Installation of 3 urinals in Westlands Park and 1 urinal in Silo Park planned for <strong>2018</strong>.<br />
<br />
<br />
<strong>Operating</strong> Supplies (+$4,000): Increased costs of cleaning supplies.<br />
Gas/Electricity (+$8,500): There is an anticipated increase of 4% for electricity costs for City facilities<br />
based on projections by Xcel Energy.<br />
103