07.11.2017 Views

2018 Adopted Annual Operating & Capital Improvement Budget

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COMMUNITY DEVELOPMENT<br />

Personnel & Financial Summary<br />

2016<br />

Audited<br />

Actuals<br />

2017<br />

Amended<br />

<strong>Budget</strong><br />

<strong>2018</strong><br />

<strong>Adopted</strong><br />

<strong>Budget</strong><br />

% Change<br />

Staff - Full Time Equivalency (FTE): 23.50 23.50 24.50 4.26%<br />

Expenditures By Category:<br />

Personnel $ 1,748,615 $ 1,875,706 $ 1,916,141 2.16%<br />

Purchased Services 474,880 562,564 456,036 -18.94%<br />

Supplies/Non-<strong>Capital</strong> Equipment 258,146 286,280 262,765 -8.21%<br />

<strong>Capital</strong> Outlay 63,972 106,000 - -100.00%<br />

Miscellaneous Expenditures 981,903 - 18,344 100.00%<br />

Total Expenditures $ 3,527,516 $ 2,830,550 $ 2,653,286 -6.26%<br />

Expenditures By Division:<br />

Administration $ 1,343,055 $ 392,174 $ 453,038 15.52%<br />

Planning 578,518 715,546 546,933 -23.56%<br />

Building Safety 583,396 633,072 651,320 2.88%<br />

Neighborhood Services 76,855 82,115 83,785 2.03%<br />

Building Services 945,692 1,007,643 918,210 -8.88%<br />

Total Expenditures $ 3,527,516 $ 2,830,550 $ 2,653,286 -6.26%<br />

Expenditures & Full-Time Equivalency<br />

Expenditures<br />

$4,000,000<br />

$3,500,000<br />

$3,000,000<br />

$2,500,000<br />

$2,000,000<br />

$1,500,000<br />

$1,000,000<br />

$500,000<br />

$-<br />

2016<br />

Audited<br />

Actuals<br />

2017<br />

Amended<br />

<strong>Budget</strong><br />

<strong>2018</strong><br />

<strong>Adopted</strong><br />

<strong>Budget</strong><br />

25.00<br />

24.50<br />

24.00<br />

23.50<br />

23.00<br />

22.50<br />

22.00<br />

21.50<br />

21.00<br />

20.50<br />

20.00<br />

Full-Time Equivalent (FTE)<br />

Total Expenditures<br />

Staff - Full Time Equivalency (FTE):<br />

Explanation of <strong>Budget</strong> Variances<br />

Overall in Community Development there is a reduction of 6.26% for <strong>2018</strong>, mostly attributable to facilities capital projects<br />

completed in 2017. Proposed for <strong>2018</strong> is the addition of 1 FTE, Facility Service Worker, which is proposed to perform<br />

cleaning services for the Maintenance Facility, Fleet Building, and 3 new hardwalled bathrooms in the parks. Elimination<br />

of the contract cleaning services for the Maintenance Facility and Fleet Building, together with the reduction in cost of<br />

port-o-let servicing for the 3 park locations where hardwalled bathrooms are constructed will significantly offset the<br />

personnel cost of the new FTE Facility Service Worker. There is an anticipated increase of 4% for electricity costs for<br />

City facilities based on projections by Xcel Energy.<br />

The Building Safety program proposes the adoption of the <strong>2018</strong> International Building Codes and associated purchase of<br />

code books in the Administration program. An increase in elevator inspection fees provided by our contracted inspection<br />

service is reflected with the $14,085 increase in Contracted Services for Building Safety. This increased fee will be<br />

reflected in what is charged back to the commercial property owners for elevator inspections. In the Planning program,<br />

the update to the Drainage Criteria Manual in conjunction with Urban Drainage and Flood Control District is anticipated<br />

for <strong>2018</strong>, but $40,000 was allocated for this work in 2017, thus the reduction in the Professional Services line item for<br />

<strong>2018</strong>. The other $60,000 reduction in the Planning program in Professional Services results from the elimination of the<br />

sign designs for a wayfinding sign program. Smart phone technology advances available to the public are viewed as to<br />

have eliminated the need for wayfinding signs for commercial destinations. Pedestrian wayfinding signage around the<br />

light-rail stations is still anticipated in coordination with RTD and SPIMD.<br />

90

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!