- Page 1:
Infusing Wellness Rejuvenation Cent
- Page 5 and 6:
Acknowledgment This journey would n
- Page 7 and 8:
2.2.4 Vegetation and therapy 9 2.2.
- Page 9 and 10:
6.6.3 Amenities within Highbrook Bu
- Page 11 and 12:
1.0 Introduction 1.1 Background of
- Page 13 and 14:
-David Pearson Precedents, on the o
- Page 15 and 16:
2.0 Architecture and Therapy 2.1 Th
- Page 17 and 18:
Day states that textures develop di
- Page 19 and 20:
2.2.3 Materials and therapy: Each m
- Page 21 and 22:
2.2.6 Texture and therapy: Textures
- Page 23 and 24:
Figure2.16 stepping stones above wa
- Page 25 and 26:
- Of the People Functionality and c
- Page 27 and 28:
4.2 The Five Elements: Constant ene
- Page 29 and 30:
5.0 Precedents Study 5.1 Therme Val
- Page 31 and 32:
5.2 House of Culture and Movement,
- Page 33 and 34:
5.3 Centre for Wellness - The Colle
- Page 35 and 36:
5.4 Myall Coast Wellness and Commun
- Page 37 and 38:
5.6 Coastlands Aquatic Centre, Kapi
- Page 39 and 40:
6.2 Site Selection Criteria Highbro
- Page 41 and 42:
6.4 Highbrook Business Park histori
- Page 43 and 44:
This is a total increase of 73 per
- Page 45 and 46:
6.6 Site Mapping 6.6.1 Existing con
- Page 47 and 48:
6.6.3 Amenities within Highbrook Bu
- Page 49 and 50:
6.6.5 Noise frequency and pedestria
- Page 51 and 52:
41
- Page 53 and 54:
7.0 Design Process 7.1 Design Brief
- Page 55 and 56:
7.4 Phase One- Initial form concept
- Page 57 and 58:
Zones were then integrated into the
- Page 59 and 60:
Figure 7.12 Outdoor recreation and
- Page 61 and 62:
Figure 7.16 Sectional perspective o
- Page 63 and 64:
As a result, tree-like roof structu
- Page 65 and 66:
The generated meander-like plan emp
- Page 67 and 68:
7.9 Phase Six- Zoning consideration
- Page 69 and 70:
7.11 Phase Eight- Design Developmen
- Page 71 and 72:
Walls strategy: Walls follow four d
- Page 73 and 74:
Figure 7.43 Social zone looking fro
- Page 75 and 76: Figure 7.46 social zone section sho
- Page 77 and 78: Critique: Horizontal movement withi
- Page 79 and 80: Exploration-2- This exploration int
- Page 81 and 82: Roof development and ETFE material:
- Page 83 and 84: 7.11.3 Wood zone exploration and de
- Page 85 and 86: Exploration-3- Timber fins, vertica
- Page 87 and 88: Wood zone-1- Yoga and Meditation Fi
- Page 89 and 90: Wood zone-3- Clinic Figure 7.74 Cli
- Page 91 and 92: Figure 7.78 sketch- running track l
- Page 93 and 94: The final developed design has been
- Page 95 and 96: -Architype Review Inc. “Centre fo
- Page 97 and 98: -Figure 2.18 Tivoli Villa d'Este fo
- Page 99 and 100: -Figure 7.22 Meander development sk
- Page 101 and 102: -Figure 12.8: Interior perspective-
- Page 103 and 104: Business parks shift to suburban ar
- Page 105 and 106: Case Study -1- Schneider Electric T
- Page 107 and 108: Case Study -2- OfficeMax: 124 Quali
- Page 109 and 110: Other buildings on site The Crossin
- Page 111 and 112: Figure 11.20: The Light Horse Bar F
- Page 113 and 114: Quest Hotel (amenities within the r
- Page 115 and 116: The relationship between landscape
- Page 117 and 118: 12.0 Appendix-B- 107
- Page 119 and 120: Figure 12.2: Main floor plan with l
- Page 121 and 122: Figure 12.4: Schematic roof plan 1:
- Page 123 and 124: Figure 12.6: Section B-B, 1:100 @ 1
- Page 125: Figure 12.8: Interior perspective-
- Page 129 and 130: Figure 12.12- Interior perspective,
- Page 131 and 132: Figure 12.14: Exterior perspective-