Noor Abid_2016-02-19
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7.7 Phase Four- Form development-2-<br />
This stage has looked at integrating the river’s meandering concept<br />
after seeing its potential in development-1. This was a response to the<br />
irregularly shaped zones which have caused some waste in space. Also,<br />
the ramping system needed some re-configuration to make it read as it<br />
was descending down from a high point, rather than landing at a low<br />
entrance then moving up to zones, then down again.<br />
The approach has involved using semi-circular shaped forms (meanderslike)<br />
to produce more efficient forms and minimise any wastage in floor<br />
area. The ramp is now acting as a river stream that splits into two in order<br />
to feed into the private and public zones, as well as linking all these<br />
meanders (zones) together.<br />
Figure 7.21 meander stages sketch<br />
Figure 7.22 Meander development sketch-1 Figure 7.23 Meander development sketch-2- Axis Figure 7.24 Meander development sketch-3 levels<br />
54