Design and detailing-illustrative example 149

Step 7 Shear reinforcement

See Example 6.12-1. Provide 10 mm mild steel links at 200 mm centres.

Step 8 Deflection

See Example 5.7-1.

Step 9 Cracking

See Example 5.7-2.

Step 10 Summary of outputs

Cross-sectional dimensions

Cover to longitudinal bars (Step 1)

Support main bars (Step 4)

Midspan main bars (Step 5)

Links (Step 7)

as in Fig. 4.11-1(a)

40 mm

two 20 mm

two 16 mm plus one 20

mm

10 mm ms at 200 mm

The reinforcement details are shown in Fig. 4.11-2, which conforms to

the standard method of detailing, as explained in Example 3.6-3.

Comments on Step 1

Preliminary member sizing is discussed in Sections 11.1, 11.2 and 11.3.

25 R10 - 6- 200

2 T 16-3

2T16 -1

1 T20-2

Cover to links= 30

3 4 4 3

Fig. 4.11-2

5 2 5

A-A