Design and· detailing-illustrative examples 437

(a} Support B

s~~KS

3T32+2T25

(b) Span AB

3T25 U-bars

so~j

sol ill£,~~

lc l Support A

s~~Kf

3T25

Cdl Span BC

Fig.ll.S-9

ss:oNIIJ ::o

2T25 U-bars

(e) Support C

From Table 4.7-2,

Note that:

z

d = 0.94

X

d = 0.13

(a) As stated at the end of Section 4.5, BS 8110 does not allow zld to

be taken as greater than 0.95 in any case.

(b) xld = 0.13. Therefore 0.9x = (0.9)(0.13)(500) =59 mm < hr, i.e.

stress block within flange thickness.

From eqn (4.8-3),

_ M _ (522)(10 6 )

As - 0.87/yz - (0.87)(460)(0.94)(500)

= 2775 mm 2 Bottom 3T32 + 2T25 (3394 mm 2 )

End support A (Fig. 11.5-9(c)). Assume nominal fixing moment equal

to 40% of the initial fixed end moment-see Comments on Step 5 at the

end:

M = 40% of 507 kNm (Fig. 11.5-5: Case 1)

= 203 kNm