LO6–4 SOLVED PROBLEM 2

The following tasks must be performed on an assembly line in the sequence and times specified:

TASK

A

B

C

D

E

F

G

H

TASK TIME

(SECONDS)

50

40

20

45

20

25

10

35

TASKS THAT MUST

PRECEDE

A

C

C

D

E

B, F, G

a. Draw the schematic diagram.

b. What is the theoretical minimum number of stations required to meet a forecast demand of

400 units per eight-hour day?

c. Use the longest-task-time rule and balance the line in the minimum number of stations to

produce 400 units per day.

Solution

a.

50 20

A

C

40

B

45

D

20

E

25

F

10

G

35

H

b. The theoretical minimum number of stations to meet D = 400 is

​N​ t ​ = ​ __ T C ​ = ​ ________________________________

245 seconds

​ = ____ ​ 245 ​ = 3.4 stations​

60 seconds × 480 minutes

​ ______________________________

( 400 units

​) ​ 72

c.

TASK

TASK TIME

(SECONDS)

REMAINING

UNASSIGNED TIME

FEASIBLE

REMAINING TASK

Station 1

Station 2

Station 3

A

C

D

F

B

E

G

50

20

45

25

40

20

10

22

2

27

2

32

12

2

C

None

E, F

None

E

G

None

Station 4 H 35 37 None