474 OPERATIONS AND SUPPLY CHAIN MANAGEMENT

exhibit 14.7

400

300

Plant Location Matrix

Plant C (275, 380)

Plant B (100, 300)

Plant D (172, 263)

PLANT COMPRESSORS REQUIRED PER YEAR

A 6,000

B 8,200

C 7,000

Y

200

100

Plant A (150, 75)

100 200

X

300 400

If IPS follows the plan presented by Solver, it will spend a little over $4 million to ship its products

to its customers next year. The recommended plan should not be too surprising—Denver

primarily satisfies the West Cost demand, Chicago serves the middle of the country, and Baltimore

serves the East. This makes sense given the reality that transportation costs increase as distance

traveled increases. Further, we can see that both Denver and Baltimore will max out their capacity

in this plan, with Chicago using only about 75 percent of capacity.

LO14–3 SOLVED PROBLEM 3

Cool Air, a manufacturer of automotive air conditioners, currently produces its XB-300 line at three

different locations: plant A, plant B, and plant C. Recently, management decided to build all compressors,

a major product component, in a separate dedicated facility, plant D.

Using the centroid method and the information displayed in Exhibit 14.7, determine a location for

plant D. Assume a linear relationship between volumes shipped and shipping costs (no premium charges).

Solution

​d​ 1x ​ = 150

​d​ 2x ​ = 100​ ​d​ 1y ​ = 75

​d​ 2y ​ = 300​ ​

​V​ 1 ​ = 6,000

​V​ 2 ​ = 8,200​

​d​ 3x ​ = 275 ​d​ 3y ​ = 380 ​V​ 3 ​ = 7,000

​C​ x ​ = ​ ______ Σ​d​ ix​V​ i ​ = ​ _____________________________________

(150 × 6,000) + (100 × 8,200) + (275 × 7,000)

​ = 171.9

Σ​V​ i ​ 6,000 + 8,200 + 7,000

​C​ y ​ = ​ Σ​d​ ​

iy​V​ i ​

______ ​ = ​ ____________________________________

(75 × 6,000) + (300 × 8,200) + (380 × 7,000)

​ = 262.7

Σ​V​ i ​ 21,200

DISCUSSION QUESTIONS

Plant D[C x , C y ] = D[172, 263]

LO14–1

1. What motivations typically cause firms to initiate a facilities location or relocation

project?

2. List five major reasons why a new electronic components manufacturing firm

should move into your city or town.

LO14–2 3. Recent figures show that almost 60 percent of the volume of freight movements in