LEAN SUPPLY CHAINS chapter 12 425

Map of the Current State exhibit 12.16

Suppliers

Production

control

(ERP)

Customer

Daily

Daily

I

Machine 1

1

I

Machine 2

1

I

Assembly

10

3 days

0.5 min

1.2 min 2.2 min

1 days 0.5 days

Production

lead = 4.5 days

Process

time = 3.9 min.

Source: Jared Lovelle, “Mapping the Value Stream,” IIE Solutions 33, no. 2 (February 2001), p. 32.

Map of the Future State exhibit 12.17

Suppliers

Production

control

(ERP)

Customer

Daily

Daily

FIFO

0.25 day

Machine 1

Machine 2

Combine

1 machines 1 and

2 into a single

machine cell

0.5 min

One-piece

flow

Assembly

10

1.2 min

One-piece

2.2 min

flow

Production

lead = 0.25 day

Process

time = 3.9 min.

Source: Jared Lovelle, “Mapping the Value Stream,” IIE Solutions 33, no. 2 (February 2001), p. 32.