11.01.2013 Views

VINCI - 2005 annual report

VINCI - 2005 annual report

VINCI - 2005 annual report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FICHE <strong>VINCI</strong><br />

PREQUALIFICATION AND IMPROVEMENT PROGRAMME IN THE UK<br />

The prequalifi cation procedure introduced by the UK’s Highways Agency as part of its programme to<br />

modernise the country’s motorway network is an incentive for improvement for candidate companies, who must now obtain a minimum<br />

score in the Capability Assessment Toolkit (CAT) in order to be invited to compete for contracts. The assessment process is based on business excellence<br />

criteria established by the European Foundation for Quality Management (EFQM). In <strong>2005</strong>, <strong>VINCI</strong> Construction Grands Projets and Ringway, Eurovia’s UK,<br />

were pre-selected under this procedure. Their scores were verifi ed by independent auditors.<br />

Bottom left. The service culture that characterises <strong>VINCI</strong> Concessions and its subsidiaries - including <strong>VINCI</strong> Park, pictured here - has led to regular customer<br />

satisfaction surveys being carried out.<br />

Bottom right. “The Link”, a roving exhibition specifi c to the A85 Angers-Tours-Vierzon motorway project, stops at all the communities along the route to inform<br />

residents about the challenges of the project and update them on progress. The exhibition has received 50,000 visitors since it was created.<br />

129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!