11.01.2013 Views

VINCI - 2005 annual report

VINCI - 2005 annual report

VINCI - 2005 annual report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

KEY FIGURES<br />

In € millions and as a percentage of revenue<br />

REVENUE OPERATING PROFIT<br />

FROM ORDINARY<br />

ACTIVITIES<br />

1,889 1,943 2,055<br />

2003 2004 <strong>2005</strong><br />

* Before tax and fi nancing costs.<br />

<strong>VINCI</strong>’S CONCESSIONS<br />

Structure Description Country % held Consolidation Residual term<br />

method (1) (in years) from<br />

31. Dec. <strong>2005</strong><br />

Motorways Concession network<br />

Cofi route intercity network 1,091 km France 65% FC 25<br />

ASF network 2,643 km France 23% EM 27<br />

Escota network 459 km France 23% EM 21<br />

A19 motorway (2) 101 km France 100% FC 65<br />

Chillán-Collipulli motorway 160 km Chile 83% FC about 18 (3)<br />

Newport Southern Distributor Road 10 km United Kingdom 50% PC 37<br />

Fredericton-Moncton motorway 200 km Canada 12% NC 23<br />

Bridges and tunnels<br />

Charilaos Trikoupis Bridge (Rion-Antirion) Peloponnese-mainland Greece 53% FC 34<br />

Tagus bridges Two bridges in Lisbon Portugal 31% (4) EM 25<br />

Severn Crossings Two bridges over the Severn United Kingdom 35% EM 11<br />

Confederation Bridge Prince Edward Island-mainland Canada 50% PC 27<br />

Prado-Carénage tunnel Tunnel in Marseilles France 32% EM 20<br />

A86 tunnels (2) 17.5 km France 65% FC 70 after opening (5)<br />

Puymorens tunnel 5.5 km France 23% EM 32<br />

Car parks Number of spaces<br />

<strong>VINCI</strong> Park 790,000 France and Europe, 100% FC about 30 (6)<br />

Canada, Hong Kong<br />

Airports <strong>2005</strong> traffi c (passengers)<br />

Cambodia (two airports) 2.1 million Cambodia 70% PC 15<br />

Chambéry-Savoie airport 190,000 France 50% PC 6<br />

Grenoble-Isère airport 270,000 France 50% PC 3<br />

Stade de France 80,000 seats France 67% PC 19<br />

1. – FC: full consolidation; PC: proportionate consolidation; EM: equity method; NC: not consolidated.<br />

2. – Under construction.<br />

3. – Variable term based on traffi c.<br />

4. – Including 3.48% transferred by Hagen as part of the share sale agreement of 16 October 2000 currently being fi nalised.<br />

5. – From the date on which the tunnels go into service.<br />

6. – Excluding service contracts and freehold car parks.<br />

24<br />

3.<br />

4.<br />

2.<br />

1.<br />

<strong>VINCI</strong> <strong>2005</strong> ANNUAL REPORT<br />

580 633<br />

2004 <strong>2005</strong><br />

REVENUE BY<br />

BUSINESS LINE<br />

NET PROFIT CASH FLOW FROM<br />

OPERATIONS*<br />

233 336<br />

2004 <strong>2005</strong><br />

791 857<br />

29.8% 30.8% 40.7% 41.7%<br />

1. Cofi route 44%<br />

2. <strong>VINCI</strong> Park 24%<br />

3. Other infrastructure 8%<br />

4. Airport services 24%<br />

Total 100%<br />

2.<br />

3.<br />

4.<br />

5.<br />

2004 <strong>2005</strong><br />

1.<br />

NET FINANCIAL<br />

DEBT<br />

3,685 4,241<br />

2004 <strong>2005</strong><br />

REVENUE BY<br />

GEOGRAPHICAL AREA<br />

1. France 75%<br />

2. United Kingdom 5%<br />

3. Rest of Europe 6%<br />

4. North America 11%<br />

5. Rest of the world 3%<br />

Total 100%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!