VINCI - 2005 annual report
VINCI - 2005 annual report
VINCI - 2005 annual report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
B/ NOISE POLLUTION<br />
Eurovia <strong>2005</strong> 2004<br />
% of quarry production (1) 93% 78%<br />
% of coating plant production (2) 68% 68%<br />
% of binder plant production (3) 88% 88%<br />
C/ DISCHARGES IN THE ATMOSPHERE – POLLUTION DUE TO DUST<br />
Eurovia <strong>2005</strong> 2004<br />
% of production of quarries (1) 94% 95%<br />
% of production of coating units (2) 85% 79%<br />
<strong>VINCI</strong> Construction Grands Projets <strong>2005</strong> 2004<br />
Worksites controlling dust 63% 50%<br />
Projects monitoring their CO 2 emissions 33% 20%<br />
Sogea-Satom (<strong>VINCI</strong> Construction) <strong>2005</strong> 2004<br />
Drilling equipment fi tted with a dust recovery system 80% 70%<br />
Concrete plants with dust fi lters 100%<br />
Coating plants fi tted with a fl ue gas treatment system 50% 36%<br />
Waste management<br />
Cofi route (<strong>VINCI</strong> Concessions) <strong>2005</strong> 2004<br />
Operations centres equipped for selective sorting 100% 100%<br />
Rest areas equipped for selective sorting 11.76% 12%<br />
Recycled products used for road maintenance and repair 13.56% 8.52%<br />
<strong>VINCI</strong> Energies 2 005<br />
Subsidiaries sorting<br />
waste paper 53%<br />
cardboard waste 60%<br />
metal waste 75%<br />
used cartridges 92%<br />
battery waste 100%<br />
used light bulbs (lamps, neon strips, and bulbs) 100%<br />
<strong>VINCI</strong> Construction Grands Projets <strong>2005</strong> 2004<br />
Construction sites sorting waste 83% 79%<br />
Construction sites with traceability of hazardous waste 67% 75%<br />
Construction sites taking measures to reduce the quantity of waste 58% 40%<br />
Construction sites recycling waste materials 54% 42%<br />
Annual expenditure on the environment<br />
<strong>2005</strong> 2004<br />
Cofi route (<strong>VINCI</strong> Concessions) €6,778,178 €6,646,336<br />
GTM Construction €589,000 (4) €582,000 (4)<br />
Eurovia €14,150,000 €4,500,000 (4)<br />
Preservation of biodiversity<br />
Cofi route (<strong>VINCI</strong> Concessions) <strong>2005</strong> 2004<br />
Number of km of fences to protect animals 1808 1671<br />
Number of crossings for small and large animals 127 88<br />
1.– In <strong>2005</strong>, 28 of the 89 full ownership quarries were located less than 200 metres from the nearest house.<br />
2.– In <strong>2005</strong>, 10 of the 41 coating plants were located less than 200 metres from the nearest house.<br />
3.– In <strong>2005</strong>, 6 of 11 binder plants were located less than 200 metres from the nearest house.<br />
4.– R&D spending only.<br />
A RESPONSIBLE GROUP/ ENVIRONMENTAL INDICATORS<br />
143