CONCESSIONS / BUSINESS REPORT<br />
Between<br />
2004 and 2008,<br />
Cofi route will<br />
invest almost<br />
€1.4 billion in<br />
the construction<br />
of new sections<br />
on its intercity<br />
network.<br />
34<br />
<strong>VINCI</strong> <strong>2005</strong> ANNUAL REPORT<br />
In view of its very substantial investment programme, Cofi route increased<br />
its fi nancing capability by €390 million during the year. Taking advantage<br />
of a particularly attractive rate (3.75%), the company launched a bond issue<br />
to raise €200 million as an addition to the 2001 issue that matures in 2016.<br />
It also obtained a loan of €190 million from the EIB to fi nance the construction<br />
of the A28 between Ecommoy and Tours. Between 2004 and 2008, Cofi route<br />
will invest almost €1.4 billion in the construction of new sections on its intercity<br />
network and €1.2 billion in the construction of the A86 Ouest tunnel completing<br />
the ring road around Paris. This investment programme makes Cofi route one<br />
of the biggest prime contractors in France.<br />
INTERCITY NETWORK. Cofi route’s intercity network consisted of 985 km of<br />
motorway in operation at the end of <strong>2005</strong>. The current construction programme<br />
will bring the network up to 1,091 km in August 2008, representing an increase<br />
of 11% over three years.<br />
During <strong>2005</strong>, Cofi route completed the A28 Alençon-Le Mans-Tours, a total<br />
of 134 km, opening the fi nal section between Ecommoy and Tours (57.5 km)<br />
in mid-December, more than four months ahead of schedule. This “regional<br />
development” motorway aims to boost the economic growth of the area<br />
it serves. In addition, the A28 is a key link in the planned Calais-Bayonne<br />
motorway route, which will facilitate the movement of people and goods<br />
between northern Europe and the Iberian peninsula without transiting via<br />
Paris.<br />
100 KM OF NETWORK TO BE COMPLETED BY 2008 (COFIROUTE COFIROUTE NETWORK)<br />
NETWORK<br />
Nantes - Vieilleville<br />
Porte de Rennes<br />
Ancenis<br />
Ancenis<br />
La Gravelle<br />
Laval<br />
Ouest<br />
Saint-<br />
Germain-<br />
des-Près<br />
Mayenne<br />
A11 Angers (new 14.3 km section)<br />
Under construction (opening end August end August 2008) 2008)<br />
A11<br />
Loire-Atlantique<br />
0 10 20 km<br />
Saint-Jean-de-Linières<br />
Network in service<br />
Sections under construction<br />
Rouessé-Fontaine<br />
interchange<br />
Under construction (opening end 2006)<br />
Laval Est<br />
Maine-et-Loire<br />
A81<br />
Vaiges<br />
Joué-en-<br />
Charnie<br />
A11<br />
(ASF)<br />
A85<br />
Le Mans Nord<br />
Sarthe<br />
Beaufort-en-Vallée<br />
Vivy-Saumur<br />
Longué-Jumelles<br />
Brain-sur-Allonne (différé)<br />
Bourgueil<br />
Orne<br />
Alençon Nord<br />
Alençon Sud<br />
Le Mans<br />
Ouest<br />
A28<br />
Maresché<br />
Montabon<br />
Restigné<br />
(différé)<br />
A85 northern<br />
Langeais bypass (18 + 7 km)<br />
Under construction (opening end August end August 2007) 2007)<br />
A28<br />
Écommoy<br />
Neuillé-Pont-Pierre<br />
Châtellerault -<br />
Châtellerault -<br />
Poitiers Sud<br />
Sorigny<br />
Sainte-Maure-<br />
de-Touraine<br />
Futuroscope<br />
Poitiers Nord<br />
A14<br />
A13<br />
A86 Ouest tunnel<br />
Under construction between Rueil Rueil Malmaison Malmaison A12<br />
and Versailles(Est 1 opening 1 opening end 2007; end 2007; Est 2 end Est 2009) 2 end 2009)<br />
N118<br />
La Ferté-<br />
Bernard<br />
Tours Nord<br />
Langeais<br />
Est Druye<br />
Monts -Sorigny<br />
A10<br />
Monnaie<br />
Tours - Centre<br />
Esvres<br />
Bléré<br />
Indre-<br />
et-Loire<br />
Brou<br />
A11<br />
Château-Renault<br />
Eure-et-Loir<br />
Blois<br />
Thivars<br />
Parigné-l’Évêque<br />
Auvours<br />
interchange<br />
Under Under construction (opening end 2006)<br />
Meung-sur-Loire<br />
Mer<br />
Chémery<br />
Saint-Romain<br />
sur-Cher<br />
Orléans - Nord<br />
Loir-et-Cher<br />
Yvelines<br />
A10<br />
Saint-Arnoult<br />
Ablis<br />
Dourdan<br />
N104<br />
Chartres<br />
A85<br />
Artenay<br />
Villefranche-<br />
sur-Cher<br />
A85 Saint-Romain-<br />
sur-Cher -<br />
Esvres (44 km)<br />
Under construction<br />
(opening end January 2008)<br />
A85 Esvres-Druye (19 km)<br />
Under construction (opening end April 2008)<br />
Allainville<br />
Allaines<br />
A10<br />
Orléans Centre<br />
Olivet<br />
A71<br />
Essonne<br />
Loiret<br />
Lamotte-Beuvron<br />
Salbris<br />
A20<br />
Vierzon - Nord<br />
Vierzon - Est<br />
Bourges<br />
Cher