CONCESSIONS / BUSINESS REPORT<br />

Between<br />

2004 and 2008,<br />

Cofi route will<br />

invest almost<br />

€1.4 billion in<br />

the construction<br />

of new sections<br />

on its intercity<br />

network.<br />

34<br />

<strong>VINCI</strong> <strong>2005</strong> ANNUAL REPORT<br />

In view of its very substantial investment programme, Cofi route increased<br />

its fi nancing capability by €390 million during the year. Taking advantage<br />

of a particularly attractive rate (3.75%), the company launched a bond issue<br />

to raise €200 million as an addition to the 2001 issue that matures in 2016.<br />

It also obtained a loan of €190 million from the EIB to fi nance the construction<br />

of the A28 between Ecommoy and Tours. Between 2004 and 2008, Cofi route<br />

will invest almost €1.4 billion in the construction of new sections on its intercity<br />

network and €1.2 billion in the construction of the A86 Ouest tunnel completing<br />

the ring road around Paris. This investment programme makes Cofi route one<br />

of the biggest prime contractors in France.<br />

INTERCITY NETWORK. Cofi route’s intercity network consisted of 985 km of<br />

motorway in operation at the end of <strong>2005</strong>. The current construction programme<br />

will bring the network up to 1,091 km in August 2008, representing an increase<br />

of 11% over three years.<br />

During <strong>2005</strong>, Cofi route completed the A28 Alençon-Le Mans-Tours, a total<br />

of 134 km, opening the fi nal section between Ecommoy and Tours (57.5 km)<br />

in mid-December, more than four months ahead of schedule. This “regional<br />

development” motorway aims to boost the economic growth of the area<br />

it serves. In addition, the A28 is a key link in the planned Calais-Bayonne<br />

motorway route, which will facilitate the movement of people and goods<br />

between northern Europe and the Iberian peninsula without transiting via<br />

Paris.<br />

100 KM OF NETWORK TO BE COMPLETED BY 2008 (COFIROUTE COFIROUTE NETWORK)<br />

NETWORK<br />

Nantes - Vieilleville<br />

Porte de Rennes<br />

Ancenis<br />

Ancenis<br />

La Gravelle<br />

Laval<br />

Ouest<br />

Saint-<br />

Germain-<br />

des-Près<br />

Mayenne<br />

A11 Angers (new 14.3 km section)<br />

Under construction (opening end August end August 2008) 2008)<br />

A11<br />

Loire-Atlantique<br />

0 10 20 km<br />

Saint-Jean-de-Linières<br />

Network in service<br />

Sections under construction<br />

Rouessé-Fontaine<br />

interchange<br />

Under construction (opening end 2006)<br />

Laval Est<br />

Maine-et-Loire<br />

A81<br />

Vaiges<br />

Joué-en-<br />

Charnie<br />

A11<br />

(ASF)<br />

A85<br />

Le Mans Nord<br />

Sarthe<br />

Beaufort-en-Vallée<br />

Vivy-Saumur<br />

Longué-Jumelles<br />

Brain-sur-Allonne (différé)<br />

Bourgueil<br />

Orne<br />

Alençon Nord<br />

Alençon Sud<br />

Le Mans<br />

Ouest<br />

A28<br />

Maresché<br />

Montabon<br />

Restigné<br />

(différé)<br />

A85 northern<br />

Langeais bypass (18 + 7 km)<br />

Under construction (opening end August end August 2007) 2007)<br />

A28<br />

Écommoy<br />

Neuillé-Pont-Pierre<br />

Châtellerault -<br />

Châtellerault -<br />

Poitiers Sud<br />

Sorigny<br />

Sainte-Maure-<br />

de-Touraine<br />

Futuroscope<br />

Poitiers Nord<br />

A14<br />

A13<br />

A86 Ouest tunnel<br />

Under construction between Rueil Rueil Malmaison Malmaison A12<br />

and Versailles(Est 1 opening 1 opening end 2007; end 2007; Est 2 end Est 2009) 2 end 2009)<br />

N118<br />

La Ferté-<br />

Bernard<br />

Tours Nord<br />

Langeais<br />

Est Druye<br />

Monts -Sorigny<br />

A10<br />

Monnaie<br />

Tours - Centre<br />

Esvres<br />

Bléré<br />

Indre-<br />

et-Loire<br />

Brou<br />

A11<br />

Château-Renault<br />

Eure-et-Loir<br />

Blois<br />

Thivars<br />

Parigné-l’Évêque<br />

Auvours<br />

interchange<br />

Under Under construction (opening end 2006)<br />

Meung-sur-Loire<br />

Mer<br />

Chémery<br />

Saint-Romain<br />

sur-Cher<br />

Orléans - Nord<br />

Loir-et-Cher<br />

Yvelines<br />

A10<br />

Saint-Arnoult<br />

Ablis<br />

Dourdan<br />

N104<br />

Chartres<br />

A85<br />

Artenay<br />

Villefranche-<br />

sur-Cher<br />

A85 Saint-Romain-<br />

sur-Cher -<br />

Esvres (44 km)<br />

Under construction<br />

(opening end January 2008)<br />

A85 Esvres-Druye (19 km)<br />

Under construction (opening end April 2008)<br />

Allainville<br />

Allaines<br />

A10<br />

Orléans Centre<br />

Olivet<br />

A71<br />

Essonne<br />

Loiret<br />

Lamotte-Beuvron<br />

Salbris<br />

A20<br />

Vierzon - Nord<br />

Vierzon - Est<br />

Bourges<br />

Cher